[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130675":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130675,794,2,"多选题","沿海港口建设工程项目总概算应由（ ）组成。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程费用",true,{"key":16,"text":17,"correct":14},"B","工程建设其他费用",{"key":19,"text":20,"correct":14},"C","预留费用",{"key":22,"text":23,"correct":24},"D","利息",false,{"key":26,"text":27,"correct":14},"E","专项概算","ABCE","2020版教材页码P305-P309 沿海港口建设工程项目总概算应由工程费用、工程建设其他费用、预留费用、建设期利息和专项概算组成。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]