[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130652":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130652,794,2,"多选题","编制疏浚工程施工组织设计的依据应包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工合同",true,{"key":16,"text":17,"correct":18},"B","投标文件",false,{"key":20,"text":21,"correct":14},"C","设计文件",{"key":23,"text":24,"correct":14},"D","采用的规范与标准",{"key":26,"text":27,"correct":14},"E","会议纪要","ACDE","2020版教材页码P295-P298 疏浚与吹填工程施工组织设计编制依据:包括施工合同、设计文件、采用的规范与标准、会议纪要等。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]