[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130635":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130635,794,2,"多选题","工程竣工后，要搞好工程的技术总结，主要要抓好（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","技术总结的主要内容",true,{"key":16,"text":17,"correct":18},"B","确定项目经济效益后进行技术总结",false,{"key":20,"text":21,"correct":14},"C","确定技术总结题材",{"key":23,"text":24,"correct":14},"D","积累、收集好素材和资料",{"key":26,"text":27,"correct":18},"E","施工体会、经验及值得改进处和改进措施的总结","ACD","2020版教材页码P280-P281 做好工程的技术总结，主要抓好以下几点: （一）确定总结的题材； （二）积累、收集好总结素材和资料； （三）技术总结的主要内容。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]