[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130605":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130605,794,2,"多选题","在台风威胁中，以下做法正确的为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","自航施工船舶拆卸主机进行修理",false,{"key":16,"text":17,"correct":18},"B","跟踪记录、标绘、分析台风动向",true,{"key":20,"text":21,"correct":18},"C","召开防台会议，部署防台工作",{"key":23,"text":24,"correct":18},"D","备足防台期间的粮食、肉菜以及足够的淡水、燃油",{"key":26,"text":27,"correct":14},"E","施工船舶立即拆卸锚机进行紧急修理","BCD","2020版教材页码P264-P268 在台风威胁中 （1）项目经理部跟踪记录、标绘、分析台风动向;召开防台会议，部署防台工作;指定防台值班拖轮;向所辖船舶通报台风最新信息。 （2）施工船舶眼踪记录、标绘、分析台风动向;备足防台期间的粮食、肉菜以及足够的谈水、燃油。 （3）施工船舶不得拆卸主机、锚机、舵机、锚链等重要机械属具进行修理;已拆卸的尽快恢复，来不及恢复的报项目经理部。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]