[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130588":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130588,794,2,"多选题","综合单价是完成工程量清单中一个质量合格的规定计量单位项目所需的（ ）的价格。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","直接费",true,{"key":16,"text":17,"correct":14},"B","间接费",{"key":19,"text":20,"correct":21},"C","专项费用",false,{"key":23,"text":24,"correct":14},"D","利润和税金",{"key":26,"text":27,"correct":14},"E","风险因素费用","ABDE","2020版教材页码P233-P235 工程量计算规则计算的设计图纸净尺度的工程数量，计价采用的综合单价是完成工程量清单中一个质量合格的规定计量单位项目所需的直接费、间接费、利润和税金，并考虑风险因素的价格。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]