[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130586":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130586,794,2,"多选题","疏浚工程量计算时应考虑（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","超深",true,{"key":16,"text":17,"correct":14},"B","超宽",{"key":19,"text":20,"correct":21},"C","流失",false,{"key":23,"text":24,"correct":21},"D","沉降",{"key":26,"text":27,"correct":21},"E","回淤","AB","2020版教材页码P235-P238 疏浚工程采用实测下方进行土方计量时，应分别计算设计断面工程量、计算超深与计算超宽工程量、根据自然条件与施工工期计入的施工期回淤工程量。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]