[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130538":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130538,794,2,"多选题","关于地基处理，以下说法正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","排水固结法分为堆载预压法和真空预压法两类",true,{"key":16,"text":17,"correct":14},"B","竖向排水通道深度至少应超过最危险滑动面2m",{"key":19,"text":20,"correct":21},"C","一般土质条件下，抽真空3个月固结度可达到85% - 90% ，堆载预压法达到同样固结度需3个月以上",false,{"key":23,"text":24,"correct":14},"D","真空预压法，在满足真空度要求的条件下，应连续抽气，当沉降稳定后，方可停泵卸载",{"key":26,"text":27,"correct":14},"E","真空预压沉降稳定的标准是：实测地面沉降速率连续5～10d平均沉降量不大于2mm／d","ABDE","2020版教材页码P76-P79 一般土质条件下，抽真空3个月固结度可达到85% - 90% ，堆载预压法达到同样固结度需4个月以上。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]