[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130534":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130534,794,2,"多选题","真空预压工程应作好施工监测和效果检验，应进行（ ）等的观测，膜下真空度应稳定在80kPa以上，以保证效果。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","孔隙水",true,{"key":16,"text":17,"correct":14},"B","位移",{"key":19,"text":20,"correct":21},"C","土的抗压强度",false,{"key":23,"text":24,"correct":14},"D","沉降",{"key":26,"text":27,"correct":14},"E","真空度","ABDE","2020版教材页码P76-P79 真空预压法施工监测和效果检验真空预压工程应进行真空度、沉降、位移、孔隙水等的观测膜下真空度应稳定在80kPa以上，以保证效果。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]