[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130443":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130443,794,2,"多选题","绞吸式挖泥船分层施工时上层挖泥宜较厚、最后一层应较薄，其目的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","保证挖宽",false,{"key":16,"text":17,"correct":14},"B","提高时间利用率",{"key":19,"text":20,"correct":21},"C","保证质量",true,{"key":23,"text":24,"correct":14},"D","保证安全",{"key":26,"text":27,"correct":21},"E","保证挖泥船的效能","CE","2020版教材页码P188-P193 分层挖泥的厚度应根据土质和挖泥船绞刀的性能确定，淤泥类土和松散砂宜取绞刀直径的1.5 - 2.5倍，软黏土和密实砂宜取绞刀直径的1.0 - 2.0倍，硬黏土宜取绞刀直径的0.75 - 1. 0倍，软岩石宜取绞刀直径的0.3 - 0.75倍;分层的上层宜较厚，以保证挖泥船的效能;最后一层应较薄，以保证工程质量;当浚前泥面在水面以上，或水深小于挖泥船的吃水时，最上层开挖深度应满足挖泥船吃水和最小挖深的要求。当泥层过厚时应在高潮挖土层，低潮挖下层，以减少塌方。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]