[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130438":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130438,794,2,"多选题","下列关于陆上开挖、弃渣的施工说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开挖施工由高到低开挖至设计底高",true,{"key":16,"text":17,"correct":18},"B","开挖施工从里向外开挖至设计底高",false,{"key":20,"text":21,"correct":14},"C","清渣施工应先挖运水面以上石渣",{"key":23,"text":24,"correct":14},"D","陆上弃渣高程应满足设计要求",{"key":26,"text":27,"correct":14},"E","陆上弃渣边坡应满足设计要求","ACDE","2020版教材页码P176-P179 陆上开挖、弃渣应符合下列规定: （1）开挖施工宜从临水一侧开始，由高到低、从外向里开挖至设计底高。 （2）采取机械挖运出渣应保持边坡稳定，工程机械与水边应有足够的安全距离。 （3）清渣施工应先挖运水面以上石渣，并根据施工期多年平均水位，确定预留开挖水下石渣施工平台高程。 （4）陆上弃渣高程、范围、边坡应满足设计要求。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]