[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130358":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130358,794,2,"多选题","工程索赔中工程环境的变化包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","地质条件的变化",true,{"key":16,"text":17,"correct":14},"B","国家政策的变化",{"key":19,"text":20,"correct":21},"C","设计文件的改变",false,{"key":23,"text":24,"correct":21},"D","征地、拆迁的干扰",{"key":26,"text":27,"correct":21},"E","前项合同工程承包商的推迟","AB","",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]