[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130345":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130345,794,2,"多选题","内河航运工程建设项目总概算中其他费用包括（ ）等费用。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","联合试运转费",true,{"key":16,"text":17,"correct":14},"B","生产职工培训费",{"key":19,"text":20,"correct":21},"C","扫海费",false,{"key":23,"text":24,"correct":21},"D","实船停滞费",{"key":26,"text":27,"correct":14},"E","航道整治效果观察费","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]