[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130248":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130248,794,2,"多选题","码头接岸结构及岸坡在施工期和使用期整体稳定性验算应符合下列规定：施工期应验算（ ）等各种情况下的岸坡稳定性。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","挖泥",true,{"key":16,"text":17,"correct":14},"B","回填土",{"key":19,"text":20,"correct":14},"C","抛填块石",{"key":22,"text":23,"correct":24},"D","混凝土浇筑",false,{"key":26,"text":27,"correct":14},"E","吹填","ABCE","施工期应验算挖泥、回填土、抛填块石和吹填等各种情况的岸坡稳定性，并应考虑打桩振动等因素的不利影响。施工期岸坡稳定验算应按可能出现的各种不利情况与设计低水位组合进行计算。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]