[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130247":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130247,794,2,"多选题","工程建设标准强制性条文中《高桩码头设计与施工规范》JTS 167-1-2010第10．0．11．1条对施工期验算岸坡稳定的要求有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","应验算岸坡由于挖泥对稳定性的影响",true,{"key":16,"text":17,"correct":14},"B","考虑打桩振动所带来的不利因素",{"key":19,"text":20,"correct":14},"C","施工时期按可能出现的各种受荷情况，与设计低水位组合，进行岸坡稳定性计算",{"key":22,"text":23,"correct":14},"D","应验算岸坡由于回填土、抛填块石和吹填等对稳定性的影响",{"key":25,"text":26,"correct":27},"E","码头上部结构施工的荷载对岸坡稳定的影响",false,"ABCD","施工期应验算挖泥、回填土、抛填块石和吹填等各种情况的岸坡稳定性，并应考虑打桩振动等因素的不利影响。施工期岸坡稳定验算应按可能出现的各种不利情况与设计低水位组合进行计算。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]