[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130225":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130225,794,2,"多选题","水工建筑物施工，在施工前及施工过程中应按要求测设一定数量的（ ），并应定期检测。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","永久控制点",true,{"key":16,"text":17,"correct":18},"B","水位观测站",false,{"key":20,"text":21,"correct":14},"C","沉降观测点",{"key":23,"text":24,"correct":14},"D","位移观测点",{"key":26,"text":27,"correct":18},"E","地下水观测点","ACD","",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]