[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130152":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130152,794,2,"多选题","工程勘察报告关于场地地下水情况的描述中应包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","地下水体积",false,{"key":16,"text":17,"correct":18},"B","地下水类型",true,{"key":20,"text":21,"correct":18},"C","地下水形成条件",{"key":23,"text":24,"correct":18},"D","地下水水位特征",{"key":26,"text":27,"correct":14},"E","地下水的可采性","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]