[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130055":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130055,794,2,"多选题","斜坡堤抛砂施工应分段，砂垫层抛填后应及时用块石等覆盖。分段的长度应根据（ ）确定。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","自然条件",true,{"key":16,"text":17,"correct":18},"B","气候条件",false,{"key":20,"text":21,"correct":18},"C","水流条件",{"key":23,"text":24,"correct":14},"D","施工条件",{"key":26,"text":27,"correct":18},"E","供料情况","AD","",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]