[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130019":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130019,794,2,"多选题","板桩码头建筑物沉桩施工，可采用（ ）方法。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","插打沉桩",false,{"key":16,"text":17,"correct":18},"B","一次沉桩",true,{"key":20,"text":21,"correct":14},"C","复打沉桩",{"key":23,"text":24,"correct":14},"D","冲击沉桩",{"key":26,"text":27,"correct":18},"E","多次往复沉桩","BE","钢筋棍凝土板桩沉桩应逐根依次套榫插入，宜采用一次沉桩至设计高程或阶梯式往复沉桩的方法。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]