[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129968":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1129968,794,1,"单选题","单位工程、分部分项工程的划分应由（ ）组织进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","监理单位",false,{"key":16,"text":17,"correct":14},"B","施工单位",{"key":19,"text":20,"correct":21},"C","建设单位",true,{"key":23,"text":24,"correct":14},"D","质量监督部门","2020版教材页码P323-P327 施工企业在开工前应在建设单位的组织、监理单位参加下对单位工程和分部、分项工程做出明确划分，并报水运工程质量监督机构备案，据此进行质量控制和检验。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]