[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1129947,794,1,"单选题","吹填工程量计算时应考虑（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","超深量",false,{"key":16,"text":17,"correct":14},"B","超宽量",{"key":19,"text":20,"correct":14},"C","超挖量",{"key":22,"text":23,"correct":24},"D","沉降量",true,"2020版教材页码P295-P298 工程量计算:应按现行行业标准《疏浚与吹填工程施工规范》JTS 207-2012规定的方法和要求，计算实际的疏浚工程量（应考虑超深、超宽）和吹填工程量（应考虑沉降量、流失量及预留超填量）。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]