[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129919":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1129919,794,1,"单选题","海事局应自收到书面申请次日起至申请的拟开始施工作业次日（ ）天前，作出施工作业是否符合通航安全的决定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",true,{"key":16,"text":17,"correct":18},"B","10",false,{"key":20,"text":21,"correct":18},"C","12",{"key":23,"text":24,"correct":18},"D","15","2020版教材页码P276-P277 海上航行警告和航行通告申请的时间：应当在活动开始之日的7d前向该项活动所涉及的海区的区域主管机关递交发布海上航行警告、航行通告的书面申请。但是，有特殊情况，经区域主管机关认定，需要立即发布海上航行警告、航行通告的除外。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]