[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1129851,794,1,"单选题","工程量清单计价中的一般项目是指（ ）的项目。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术难度低",false,{"key":16,"text":17,"correct":14},"B","没有特殊技术要求",{"key":19,"text":20,"correct":14},"C","常规土建",{"key":22,"text":23,"correct":24},"D","不要求计算工程数量",true,"2020版教材页码P233-P235 一般项目计价是指为完成工程项目施工，招标人要求计列的、不以图纸计算工程数量的费用项目或发生于该工程施工准备和施工过程中招标人不要求列示工程数量的措施项目和其他项目，其综合单价是根据招标文件的要求以及施工方案或施工组织设计，以项为单位计价。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]