[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129736":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1129736,794,1,"单选题","抓斗式挖泥船挖掘黏土和密实砂，当抓斗充泥量不足时，应（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","下斗间距宜大",false,{"key":16,"text":17,"correct":14},"B","增加抓斗重叠量",{"key":19,"text":20,"correct":21},"C","减少抓斗重叠量",true,{"key":23,"text":24,"correct":14},"D","下斗间距宜小","2020版教材页码P198-P201 挖黏土和密实砂，当抓斗充泥量不足时，应减少抓斗的重叠量。当挖厚层软土时，若抓斗充泥量超过最大容量时，应增加抓斗重叠层。前移量宜取抓斗张开宽度的0.6 - 0.8倍。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]