[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129710":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129710,794,1,"单选题","土工织物铺设块的铺设长度应按设计堤宽加上一定富余长度。水下铺设富余长度宜为（）m，陆上铺设富余长度宜为0．5～1.0m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1．0～2．0",false,{"key":16,"text":17,"correct":18},"B","1．5～2．5",true,{"key":20,"text":21,"correct":14},"C","2．0～3．0",{"key":23,"text":24,"correct":14},"D","2．5～3．5","2020版教材页码P142-P143 土工织物宜事先加工成铺设块。铺设块的宽度宜为8 - 15m ，铺设块的长度应按设计堤宽加上一定富余长度。水下铺设富余长度直为1.5 - 2.5m；陆上铺设富余长度宜为0.5 - 1.0m 。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]