[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129686":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129686,794,1,"单选题","透水框架可叠加摆放，叠加层级不宜超过（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2层",false,{"key":16,"text":17,"correct":18},"B","3层",true,{"key":20,"text":21,"correct":14},"C","4层",{"key":23,"text":24,"correct":14},"D","5层","2020版教材页码P158-P165 透水框架陆上施工应符合下列规定: （1）施工前工程区域的滩面宜进行平整，不得出现局部深坑、陡坎及明显凸起。 （2）透水框架可叠加摆放，叠加层级不宜超过3层。 （3）透水框架应按设计要求的行距依序摆放，相邻两排透水框架宜错位摆放，顺水流方向不得形成连续的过流通道。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]