[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129667":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129667,794,1,"单选题","高桩码头在斜坡上打桩和打斜桩时，拟定合理的打桩顺序，采取恰当的（ ），以保证沉桩完毕后的最终位置符合设计规定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","在原桩位下沉",false,{"key":16,"text":17,"correct":18},"B","偏离桩位下沉",true,{"key":20,"text":21,"correct":14},"C","按设计桩位下沉",{"key":23,"text":24,"correct":14},"D","打桩施工顺序","2020版教材页码P126-P131 掌握斜坡上打桩和打斜桩的规律，拟定合理的打桩顺序，采取恰当的偏离桩位下沉，以保证沉桩完毕后的最终位置符合设计规定，并采取削坡和分区跳打桩的方法，防止岸坡滑动。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]