[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129661":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129661,794,1,"单选题","高桩码头施工中，沉桩后采用“双控”指标以保证满足设计承载力的要求，即控制（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","桩尖标高及桩尖的设计土层",false,{"key":16,"text":17,"correct":18},"B","桩尖标高及最后的沉桩贯入度",true,{"key":20,"text":21,"correct":14},"C","贯人度变化及桩的下沉量",{"key":23,"text":24,"correct":14},"D","桩尖的设计土层及高应变动测值","2020版教材页码P126-P131 桩沉完以后，应保证满足设计承载力的要求。一般是控制桩尖标高和打桩最后贯入度（即最后连续10击的平均贯入度） ，即\"双控\"。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]