[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129651":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129651,794,1,"单选题","应用港口与航道工程定额时，工程量的计算根据（ ）进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","实测值",false,{"key":16,"text":17,"correct":18},"B","施工图",true,{"key":20,"text":21,"correct":14},"C","初步设计",{"key":23,"text":24,"correct":14},"D","初步设计调整值","应用港口与航道工程定额的项目（分项工程部位）划分是以施工图设计深度为准，并兼顾了初步设计的深度要求。",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]