[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129500":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1129500,794,1,"单选题","（ ）为工程师不予计量的项目。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程量清单中的全部项目",false,{"key":16,"text":17,"correct":14},"B","合同文件中规定的项目",{"key":19,"text":20,"correct":14},"C","工程变更项目",{"key":22,"text":23,"correct":24},"D","施工单位超出设计图纸范围和因施工单位原因造成返工的工程量",true,"",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]