[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129410":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1129410,794,1,"单选题","对于海岸港和潮汐作用明显的河口港，如已有历时累积频率统计资料，其设计低水位也可采用历时累积频率（ ）的潮位。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","95％",false,{"key":16,"text":17,"correct":14},"B","99％",{"key":19,"text":20,"correct":21},"C","98％",true,{"key":23,"text":24,"correct":14},"D","90％","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]