[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1129403,794,1,"单选题","建筑物表层垂直位移观测的各项记录应注明观测的水文、气象情况和（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","荷载变化",true,{"key":16,"text":17,"correct":18},"B","施工进度",false,{"key":20,"text":21,"correct":18},"C","劳动力情况",{"key":23,"text":24,"correct":18},"D","材料情况","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]