[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129397":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1129397,794,1,"单选题","排水固结法加固软土基础工程结束后应进行静力触探，十字板剪切试验和室内土工试验，必要时尚应进行（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","现场抽样试验",false,{"key":16,"text":17,"correct":14},"B","现场标准贯入试验",{"key":19,"text":20,"correct":21},"C","现场载荷试验",true,{"key":23,"text":24,"correct":14},"D","现场挖孔检验","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]