[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129348":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1129348,794,1,"单选题","工程勘察报告《综合工程地质图》以（ ）为底图，根据地貌、构造、地层时代、岩土性质、不良地质现象等所做的综合工程地质分区，列有综合柱状图。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地形图",true,{"key":16,"text":17,"correct":18},"B","海图",false,{"key":20,"text":21,"correct":18},"C","航道图",{"key":23,"text":24,"correct":18},"D","地貌图","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]