[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129287":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1129287,794,1,"单选题","对溶隙、溶槽、溶洞、断层等不良地层进行固结灌浆加固与封闭处理时，设计规定压力下灌段吸浆量和持续时间指标是结束灌浆的标准，这一标准是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","小于0．4L／min持续20min",false,{"key":16,"text":17,"correct":18},"B","小于0.4L／min持续30min",true,{"key":20,"text":21,"correct":14},"C","大于0.4L／min持续20min",{"key":23,"text":24,"correct":14},"D","大于0．4L／min持续30min","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]