[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129262":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1129262,794,1,"单选题","港口与航道工程中高桩码头工程预制构件安装时，搁置面要平整，预制构件与搁置面间应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","接触紧密",true,{"key":16,"text":17,"correct":18},"B","留有空隙",false,{"key":20,"text":21,"correct":18},"C","有5mm空隙",{"key":23,"text":24,"correct":18},"D","有10mm空隙","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]