[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129253":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1129253,794,1,"单选题","港口与航道工程中桩基工程中的沉桩结束后应及时（ ），加强基桩之间的连接，以减少桩身位移，改善施工期受力状态。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","拉桩",false,{"key":16,"text":17,"correct":14},"B","浇筑桩帽",{"key":19,"text":20,"correct":14},"C","上部施工",{"key":22,"text":23,"correct":24},"D","夹桩",true,"",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]