[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129206":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1129206,794,1,"单选题","对于后浇带混凝土施工的要求，当设计未作规定时，应滞后于后浇带两侧混凝土的浇筑时间不少于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7d",false,{"key":16,"text":17,"correct":14},"B","14d",{"key":19,"text":20,"correct":14},"C","21d",{"key":22,"text":23,"correct":24},"D","30d",true,"",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]