[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1129198":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1129198,794,1,"单选题","板桩建筑物锚碇板（墙）的设置高程，在施工条件允许的情况下，应（ ），以提高其承载能力。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","尽量放高",false,{"key":16,"text":17,"correct":14},"B","尽量在施工水位",{"key":19,"text":20,"correct":21},"C","尽量放低",true,{"key":23,"text":24,"correct":14},"D","尽量在设计低水位","",{"id":6,"name":27,"category":28,"favorite":29},"一建港口与航道工程实务","建筑工程",0]