[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,8,50,1643,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,210,220,232,244,254,266,278,287,296,305,317,329,341,353,365,377,389,401,413,425,434,446,458,470,482,494,506,518,530,540,552,564,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1127821,1,"单选题","对漏洞采用大面积复合土工摸排体或篷布盖堵时，可沿临水坡肩部位（ ），顺坡铺盖洞口。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","从上到下",true,{"key":24,"text":25,"correct":26},"B","从下到上",false,{"key":28,"text":29,"correct":26},"C","从左到右",{"key":31,"text":32,"correct":26},"D","从中间向两边","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1127822,"导流明渠布置时，进出口轴线与河道主流方向的夹角宜小于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"20°",{"key":24,"text":41,"correct":22},"30°",{"key":28,"text":43,"correct":26},"40°",{"key":31,"text":45,"correct":26},"50°",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1127823,"在河谷狭窄的山区河流新建拱坝宜选用的施工导流方式是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"A：明渠导流",{"key":24,"text":53,"correct":26},"B：底孔导流",{"key":28,"text":55,"correct":26},"C：束窄河床导流",{"key":31,"text":57,"correct":22},"D：隧洞导流",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1127824,"下列有关导流泄水建筑物的布置说法不正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"A：导流明渠宜布置在弯道少的地区，避开滑坡及高边坡开挖区。",{"key":24,"text":65,"correct":26},"B：导流隧洞应在弯段首尾设置直线段",{"key":28,"text":67,"correct":26},"C：导流底孔宜布置在近河道主流位置",{"key":31,"text":69,"correct":22},"D：坝体泄洪缺口宜设在河漫滩，避免下泄水流冲刷岸坡",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1127825,"当漏洞洞口较多且较为集中，逐个堵塞费时且易扩大成洞时，可采用（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"A：塞堵法",{"key":24,"text":77,"correct":22},"B：盖堵法",{"key":28,"text":79,"correct":26},"C：戗堤法",{"key":31,"text":81,"correct":26},"D：疏导法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1127826,"某工程采用不过水土石围堰，基坑上游围堰挡水位为20m，下游围堰挡水位为19.4m，上下游水位差为0.6m，波浪爬高为0.5m，安全超高为1.0m，该工程下游围堰堰顶高程至少应为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"A：20.9m",{"key":24,"text":89,"correct":26},"B：21.5m",{"key":28,"text":91,"correct":26},"C：21.6m",{"key":31,"text":93,"correct":26},"D：22.1m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1127827,"如图所示土石围堰的防渗形式属于（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"A：斜墙式",{"key":24,"text":101,"correct":26},"B：斜墙带水平铺盖式",{"key":28,"text":103,"correct":22},"C：垂直防渗墙式",{"key":31,"text":105,"correct":26},"D：灌浆帷幕式",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1127828,"下列关于截流材料种类选择的说法，错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"截流材料主要有块石:石块:装石竹笼等",{"key":24,"text":113,"correct":22},"当截流水力条件较好时，须采用混凝土块体",{"key":28,"text":115,"correct":26},"凡有条件者，均应优先选用石块截流",{"key":31,"text":117,"correct":26},"截流时采用当地材料在我国已有悠久的历史",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1127829,"在龙口建造浮桥，沿龙口前沿抛投块料，使堆筑戗堤均匀上升的截流方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"立堵法",{"key":24,"text":125,"correct":22},"平堵法",{"key":28,"text":127,"correct":26},"塞堵法",{"key":31,"text":129,"correct":26},"盖堵法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1127830,"特别适用于大流量、大落差的河道上截流的截流方法是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"填筑截流",{"key":24,"text":137,"correct":22},"抛投块截流",{"key":28,"text":139,"correct":26},"爆破截流",{"key":31,"text":141,"correct":26},"下闸截流",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1127831,"混合堵是采用（ ）相结合的方法。",[146,148,150,152],{"key":20,"text":147,"correct":26},"上堵与下堵",{"key":24,"text":149,"correct":22},"立堵与平堵",{"key":28,"text":151,"correct":26},"爆破堵与下闸堵",{"key":31,"text":153,"correct":26},"抛投块料堵与爆破堵",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1127832,"龙口段抛投的大块石、钢筋石笼或混凝土四面体等材料数量考虑一定备用，备用系数宜取（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"1:0～1:1",{"key":24,"text":161,"correct":26},"1:1～1:2",{"key":28,"text":163,"correct":22},"1:2～1:3",{"key":31,"text":165,"correct":26},"1:3～1:4",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1127833,"以端进法抛投料进占戗堤的截流方法是（ ）法。",[170,172,174,176],{"key":20,"text":171,"correct":22},"A：立堵",{"key":24,"text":173,"correct":26},"B：平堵",{"key":28,"text":175,"correct":26},"C：塞堵",{"key":31,"text":177,"correct":26},"D：盖堵",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1127834,"建设实施阶段是指主体工程的建设实施，（ ）按照批准的建设文件，组织工程建设，保证项目建设目标的实现。",[182,184,186,188],{"key":20,"text":183,"correct":22},"项目法人",{"key":24,"text":185,"correct":26},"承包商",{"key":28,"text":187,"correct":26},"监理单位",{"key":31,"text":189,"correct":26},"设计单位",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1127835,"根据水利工程建设项目管理有关规定，项目后评价分（ ）个层次组织实施。",[194,196,198,200],{"key":20,"text":195,"correct":26},"二",{"key":24,"text":197,"correct":22},"三",{"key":28,"text":199,"correct":26},"四",{"key":31,"text":201,"correct":26},"五",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1127836,"施工详图经（ ）审核后交施工单位施工。",[206,207,208,209],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":189,"correct":26},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1127837,"水利工程具备开工条件后，（ ）将开工情况的书面报告报项目主管单位和上一级主管单位备案。",[214,215,216,218],{"key":20,"text":183,"correct":22},{"key":24,"text":187,"correct":26},{"key":28,"text":217,"correct":26},"施工单位",{"key":31,"text":219,"correct":26},"质量监督机构",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},1127838,"下列不是竣工决算审计内容的是（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":26},"建设管理体制审计",{"key":24,"text":227,"correct":26},"预留费用审计",{"key":28,"text":229,"correct":26},"建设监理审计",{"key":31,"text":231,"correct":22},"投标单位合法性审计",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1127839,"（ ）是工程完成建设目标的标志。",[236,238,240,242],{"key":20,"text":237,"correct":26},"后评价",{"key":24,"text":239,"correct":22},"竣工验收",{"key":28,"text":241,"correct":26},"竣工决算",{"key":31,"text":243,"correct":26},"完工验收",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},1127840,"水利水电工程施工详图，施工单位施工前还应由（ ）审核。",[248,250,251,252],{"key":20,"text":249,"correct":26},"建设单位",{"key":24,"text":189,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":253,"correct":26},"咨询单位",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1127841,"下列水利工程合同中，属于建设工程合同的是（ ）合同。",[258,260,262,264],{"key":20,"text":259,"correct":22},"勘察",{"key":24,"text":261,"correct":26},"监理",{"key":28,"text":263,"correct":26},"材料供应",{"key":31,"text":265,"correct":26},"设备采购",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":28,"analysis":33},1127842,"建设项目在主体工程开工之前，必须完成各项施工准备工作，其主要工作内容不包括（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":26},"组织主体工程施工招标的准备工作",{"key":24,"text":273,"correct":26},"开展征地:拆迁",{"key":28,"text":275,"correct":22},"完成施工图设计",{"key":31,"text":277,"correct":26},"组织相关监理招标",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1127843,"项目建设的活动主体是（ ）。",[282,283,284,285],{"key":20,"text":187,"correct":26},{"key":24,"text":183,"correct":22},{"key":28,"text":217,"correct":26},{"key":31,"text":286,"correct":26},"勘察设计单位",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":31,"analysis":33},1127844,"根据《水利工程建设程序管理暂行规定》（水建[1998]16号），水利工程质量由（ ）负全面责任。",[291,293,294,295],{"key":20,"text":292,"correct":26},"主管部门",{"key":24,"text":217,"correct":26},{"key":28,"text":187,"correct":26},{"key":31,"text":183,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1127845,"大坝工作状态基本正常，在一定控制运用条件下能安全运行的大坝，属于（ ）类坝。",[300,302,303,304],{"key":20,"text":301,"correct":26},"一",{"key":24,"text":195,"correct":22},{"key":28,"text":197,"correct":26},{"key":31,"text":199,"correct":26},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1127846,"根据《水利基本建设项目竣工财务决算编制规程》，小型水利工程建设项目可预计纳入竣工财务决算的未完工程投资及预留费用应控制在总概算的（ ）以内。",[309,311,313,315],{"key":20,"text":310,"correct":26},"3%",{"key":24,"text":312,"correct":22},"5%",{"key":28,"text":314,"correct":26},"10%",{"key":31,"text":316,"correct":26},"15%",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1127847,"根据《水库大坝安全鉴定办法》（水建管[2003] 271号），二类坝相应的大坝工作状态( )。",[321,323,325,327],{"key":20,"text":322,"correct":26},"正常",{"key":24,"text":324,"correct":22},"基本正常",{"key":28,"text":326,"correct":26},"不正常",{"key":31,"text":328,"correct":26},"基本不正常",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},1127848,"低温季节混凝土施工时，提高混凝土拌合料温度不应（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"热水拌合",{"key":24,"text":336,"correct":26},"碎石预热",{"key":28,"text":338,"correct":22},"直接加热水泥",{"key":31,"text":340,"correct":26},"黄沙预热",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1127849,"下列人员中，可以专家身份参加专项施工方案审查论证会的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":26},"项目法人单位人员",{"key":24,"text":348,"correct":26},"监理单位人员",{"key":28,"text":350,"correct":26},"设计单位人员",{"key":31,"text":352,"correct":22},"质量监督单位人员",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1127850,"下列属于水利水电工程施工现场一类负荷的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"基坑内的排水施工",{"key":24,"text":360,"correct":26},"混凝土浇筑施工",{"key":28,"text":362,"correct":26},"金属结构及机电安装",{"key":31,"text":364,"correct":26},"钢筋加工厂",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1127851,"通过编制工程进度曲线，可获取的信息不包括（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":26},"工程量完成情况",{"key":24,"text":372,"correct":26},"实际工程进展速度",{"key":28,"text":374,"correct":22},"关键工作",{"key":31,"text":376,"correct":26},"进度超前或拖延的时间",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1127852,"混凝土生产系统规模按生产能力划分，当其设计生产能力为150 m3\u002Fh，其规模类型为（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":26},"特大型",{"key":24,"text":384,"correct":26},"大型",{"key":28,"text":386,"correct":22},"中型",{"key":31,"text":388,"correct":26},"小型",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1127853,"下列不属于材料预算价格的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"运杂费",{"key":24,"text":396,"correct":26},"运输保险费",{"key":28,"text":398,"correct":26},"采购及保管费",{"key":31,"text":400,"correct":22},"运输摊销费",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1127854,"为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目称为（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"措施项目",{"key":24,"text":408,"correct":26},"其他项目",{"key":28,"text":410,"correct":26},"零星工作项目",{"key":31,"text":412,"correct":26},"分类分项工程项目",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1127855,"根据《水利工程设计概估算编制规定（工程部分）》（水总[2014]429号文），固定资产使用费属于（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"其他直接费",{"key":24,"text":420,"correct":22},"企业管理费",{"key":28,"text":422,"correct":26},"基本直接费",{"key":31,"text":424,"correct":26},"现场管理费",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1127856,"暂列金额一般可为分类分项工程项目和措施项目合价的（ ）。",[429,430,431,432],{"key":20,"text":310,"correct":26},{"key":24,"text":312,"correct":22},{"key":28,"text":314,"correct":26},{"key":31,"text":433,"correct":26},"30%",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1127857,"钻孔灌注桩或者沉管灌注桩按施工图纸所示尺寸计算的桩体（ ）为单位计量，按《工程量清单》相应项目有效工程量的每立方米工程单价支付。",[438,440,442,444],{"key":20,"text":439,"correct":26},"实际桩长以米",{"key":24,"text":441,"correct":22},"有效体积以立方米",{"key":28,"text":443,"correct":26},"有效桩长以米",{"key":31,"text":445,"correct":26},"设计体积以立方米",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},1127858,"主要用于初步设计阶段预测工程造价的定额为（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"概算定额",{"key":24,"text":453,"correct":26},"预算定额",{"key":28,"text":455,"correct":26},"施工定额",{"key":31,"text":457,"correct":26},"投资估算指标",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1127859,"根据《水利建筑工程预算定额》（2002版），零星材料费以（ ）作为计费基数。",[462,464,466,468],{"key":20,"text":463,"correct":26},"主要材料费之和",{"key":24,"text":465,"correct":22},"人工费机械费之和",{"key":28,"text":467,"correct":26},"主要机械费之和",{"key":31,"text":469,"correct":26},"主要人工费之和",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},1127860,"根据《水利建设工程文明工地创建管理暂行办法》（中水协[2009]39号），水利建设市场主体信用等级中，A级表示信用（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"好",{"key":24,"text":477,"correct":26},"一般",{"key":28,"text":479,"correct":26},"很好",{"key":31,"text":481,"correct":22},"较好",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1127861,"水利建设市场主体信用等级为BBB级表示（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"信用很好",{"key":24,"text":489,"correct":26},"信用好",{"key":28,"text":491,"correct":26},"信用较好",{"key":31,"text":493,"correct":22},"信用一般",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1127862,"某水闸加固改造工程土建标共有甲、乙、丙、丁四家潜在投标人购买了资格预审文件，经审查乙、丙、丁三个投标人通过了资格预审。在规定时间内乙向招标人书面提出了在阅读招标文件和现场踏勘中的疑问，招标人确认后应在规定时间内将招标文件的答疑以书面形式发给（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":26},"甲",{"key":24,"text":501,"correct":26},"乙",{"key":28,"text":503,"correct":22},"乙:丙:丁",{"key":31,"text":505,"correct":26},"甲:乙:丙:丁",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":20,"analysis":33},1127863,"根据《水利建设工程施工分包管理规定》（水建管[2005]304号），不得进行工程分包的结构物是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"主要建筑物的主体结构",{"key":24,"text":513,"correct":26},"次要建筑物的主体结构",{"key":28,"text":515,"correct":26},"主要建筑物的全部结构",{"key":31,"text":517,"correct":26},"次要建筑物的全部结构",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":33},1127864,"根据《水利水电工程标准施工招标文件》，监理人应在开工日期（ ）天前向承包人发出开工通知。",[522,524,526,528],{"key":20,"text":523,"correct":26},"3",{"key":24,"text":525,"correct":26},"5",{"key":28,"text":527,"correct":22},"7",{"key":31,"text":529,"correct":26},"14",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},1127865,"承包人应在知道或应当知道索赔事件发生后（ ）天内，向监理人递交索赔意向通知书，并说明发生索赔事件的事由。",[534,535,536,538],{"key":20,"text":527,"correct":26},{"key":24,"text":529,"correct":26},{"key":28,"text":537,"correct":22},"28",{"key":31,"text":539,"correct":26},"56",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1127866,"分包人设立的项目管理机构人员中，可以不是本单位人员的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":26},"技术负责人",{"key":24,"text":547,"correct":26},"财务负责人",{"key":28,"text":549,"correct":26},"安全管理人员",{"key":31,"text":551,"correct":22},"施工人员",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1127867,"《水利水电工程标准施工招标资格预审文件》中，应不加修改引用的是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"招标人须知",{"key":24,"text":559,"correct":26},"评标办法",{"key":28,"text":561,"correct":26},"通用合同条款",{"key":31,"text":563,"correct":22},"申请人须知",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},1127868,"施工合同文件的构成中，投标人进行投标报价和发包人进行合同支付的实物依据的文件是（ ）。",[568,570,572,573],{"key":20,"text":569,"correct":26},"协议书",{"key":24,"text":571,"correct":26},"专用合同条款",{"key":28,"text":561,"correct":26},{"key":31,"text":574,"correct":22},"技术条款",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":28,"analysis":33},1127869,"变更指示只能由（ ）发出。",[579,581,583,585],{"key":20,"text":580,"correct":26},"发包人",{"key":24,"text":582,"correct":26},"承包人",{"key":28,"text":584,"correct":22},"监理人",{"key":31,"text":586,"correct":26},"业主",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},1127870,"一般工程预付款为签约合同价的（ ）%，分两次支付。",[591,592,594,596],{"key":20,"text":525,"correct":26},{"key":24,"text":593,"correct":22},"10",{"key":28,"text":595,"correct":26},"15",{"key":31,"text":597,"correct":26},"20",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]