[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,3,50,1643,[13,34,46,58,68,80,92,103,114,126,134,146,158,168,179,191,200,208,220,232,244,256,265,277,289,298,310,322,334,345,353,365,377,389,401,412,424,436,448,460,469,481,492,504,514,526,536,548,556,565],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1127567,1,"单选题","在龙门建造浮桥，延龙口前沿抛投块料，使堆筑戗堤均匀上升的截流方法是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","立堵法",false,{"key":24,"text":25,"correct":26},"B","平堵法",true,{"key":28,"text":29,"correct":22},"C","塞堵法",{"key":31,"text":32,"correct":22},"D","盖堵法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1127568,"以端进法抛投块料进占戗堤的截流方法是()法。",[38,40,42,44],{"key":20,"text":39,"correct":26},"立堵",{"key":24,"text":41,"correct":22},"平堵",{"key":28,"text":43,"correct":22},"塞堵",{"key":31,"text":45,"correct":22},"盖堵",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1127569,"（2017年）水利工程中，起重机械从220kV高压线通过时，其最高点与高压线之间的最小垂直距离不得小于（ ）m。",[50,52,54,56],{"key":20,"text":51,"correct":22},"4",{"key":24,"text":53,"correct":22},"5",{"key":28,"text":55,"correct":26},"6",{"key":31,"text":57,"correct":22},"7",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1127570,"（2020年真题）首先从龙口两端下料，保护戗堤头部，同时施工护底工程并抬高龙口底槛高程到一定高度，再从龙口两端抛投块料截断河流的截流方法是（ ）。",[62,63,64,66],{"key":20,"text":41,"correct":22},{"key":24,"text":39,"correct":22},{"key":28,"text":65,"correct":26},"混合堵",{"key":31,"text":67,"correct":22},"抬高底槛",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1127571,"根据《关于水利工程建设项目代建制管理的指导意见》（水建管[2015]91号），实施代建制的项目应在（）中提出实行代建制管理的方案。",[72,74,76,78],{"key":20,"text":73,"correct":22},"项目建议书",{"key":24,"text":75,"correct":26},"可行性研究报告",{"key":28,"text":77,"correct":22},"初步设计报告",{"key":31,"text":79,"correct":22},"工程开工申请报告",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},1127572,"大坝安全鉴定报告书由()编制。",[84,86,88,90],{"key":20,"text":85,"correct":22},"评审专家组",{"key":24,"text":87,"correct":22},"鉴定审定部门",{"key":28,"text":89,"correct":22},"鉴定组织单位",{"key":31,"text":91,"correct":26},"鉴定承担单位",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1127573,"根据水利部《水利工程建设项目管理规定》（水建[1995]128号）和有关规定，下列阶段中，不属于水利工程建设程序的是（）。",[96,98,99,101],{"key":20,"text":97,"correct":22},"招标设计",{"key":24,"text":73,"correct":22},{"key":28,"text":100,"correct":22},"可行性研究",{"key":31,"text":102,"correct":26},"预可行性研究",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},1127574,"根据水利部《水库大坝安全鉴定办法》（水建管[2003]271号），水库大坝首次安全鉴定应在竣工验收后()年内进行。",[107,109,111,112],{"key":20,"text":108,"correct":22},"1",{"key":24,"text":110,"correct":22},"3",{"key":28,"text":53,"correct":26},{"key":31,"text":113,"correct":22},"10",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},1127575,"根据水库大坝安全鉴定有关规定，病险水库是指通过规定程序确定为()类坝的水库。",[118,120,122,124],{"key":20,"text":119,"correct":22},"一",{"key":24,"text":121,"correct":22},"二",{"key":28,"text":123,"correct":26},"三",{"key":31,"text":125,"correct":22},"四",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":28,"analysis":33},1127576,"根据《水库大坝安全鉴定办法》（水建管[2003]271号），大坝首次安全鉴定应在竣工验收后()年内进行。",[130,131,132,133],{"key":20,"text":108,"correct":22},{"key":24,"text":110,"correct":22},{"key":28,"text":53,"correct":26},{"key":31,"text":57,"correct":22},{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},1127577,"根据《水利工程建设程序管理暂行规定》（水建[1998]16号），水利工程建设项目生产准备阶段的工作应由()完成。",[138,140,142,144],{"key":20,"text":139,"correct":22},"项目主管部门",{"key":24,"text":141,"correct":26},"项目法人",{"key":28,"text":143,"correct":22},"运行管理单位",{"key":31,"text":145,"correct":22},"施工单位",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":31,"analysis":33},1127578,"根据《水利工程建设项目管理规定》（水建[1995]128号），水利水电工程完成建设目标的标志是()。",[150,152,154,156],{"key":20,"text":151,"correct":22},"合同工程完工验收",{"key":24,"text":153,"correct":22},"专项验收",{"key":28,"text":155,"correct":22},"后评价",{"key":31,"text":157,"correct":26},"竣工验收",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":28,"analysis":33},1127579,"水利工程一般设计变更经审查确认后，应报（）核备。",[162,163,165,166],{"key":20,"text":141,"correct":22},{"key":24,"text":164,"correct":22},"监理单位",{"key":28,"text":139,"correct":26},{"key":31,"text":167,"correct":22},"原设计审批部门",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":28,"analysis":33},1127580,"水利工程施工详图交施工单位施工前应经()审核。",[172,174,176,177],{"key":20,"text":173,"correct":22},"建设单位",{"key":24,"text":175,"correct":22},"设计单位",{"key":28,"text":164,"correct":26},{"key":31,"text":178,"correct":22},"咨询单位",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":24,"analysis":33},1127581,"水利工程建设项目管理“三项”制度不包括（）。",[183,185,187,189],{"key":20,"text":184,"correct":22},"项目法人责任制",{"key":24,"text":186,"correct":26},"政府监督制",{"key":28,"text":188,"correct":22},"招标投标制",{"key":31,"text":190,"correct":22},"建设监理制",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":28,"analysis":33},1127582,"在水利工程建设程序中，不属于前期工作的是()。",[195,196,197,198],{"key":20,"text":73,"correct":22},{"key":24,"text":75,"correct":22},{"key":28,"text":97,"correct":26},{"key":31,"text":199,"correct":22},"初步设计",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1127583,"根据《水库大坝安全鉴定办法》（水建管[2003]271号），经鉴定在一定控制运用条件下能安全运行的大坝属于()类坝。",[204,205,206,207],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":26},{"key":28,"text":123,"correct":22},{"key":31,"text":125,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},1127584,"（2018年）根据《关于水利工程建设项目代建制管理的指导意见》(水建管[2015]91号),下列资质中不符合代建单位资质条件的是（）。",[212,214,216,218],{"key":20,"text":213,"correct":26},"监理",{"key":24,"text":215,"correct":22},"设计",{"key":28,"text":217,"correct":22},"咨询",{"key":31,"text":219,"correct":22},"施工总承包",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},1127585,"（2019年）当水利工程建设项目初步设计静态总投资超过已批准的可行性研究报告估算静态总投资达10%时,则需()。",[224,226,228,230],{"key":20,"text":225,"correct":26},"提出专题分析报告",{"key":24,"text":227,"correct":22},"重新编制初步设计",{"key":28,"text":229,"correct":22},"调整可行性研究投资估",{"key":31,"text":231,"correct":22},"重新编制可行性研究报告",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":28,"analysis":33},1127586,"（2019年）水库大坝首次安全鉴定应在竣工验收后()内进行。",[236,238,240,242],{"key":20,"text":237,"correct":22},"三年",{"key":24,"text":239,"correct":22},"四年",{"key":28,"text":241,"correct":26},"五年",{"key":31,"text":243,"correct":22},"十年",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1127587,"（2019年）下列内容中,不属于竣工决算审计监督和评价的内容是决算的（）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"真实性",{"key":24,"text":251,"correct":22},"合法性",{"key":28,"text":253,"correct":22},"效益性",{"key":31,"text":255,"correct":26},"时效性",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1127588,"（2019年）施工详图提交施工单位前，应由（）签发。",[260,261,262,263],{"key":20,"text":141,"correct":22},{"key":24,"text":164,"correct":26},{"key":28,"text":175,"correct":22},{"key":31,"text":264,"correct":22},"质量监督机构",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},1127589,"（2020年真题）根据《水利基本建设项目竣工财务决算编制规程》（SL19-2014），小型项目未完工程投资及预留费用可预计纳入竣工财务决算，但占总投资比例应控制在（）以内。",[269,271,273,275],{"key":20,"text":270,"correct":26},"5%",{"key":24,"text":272,"correct":22},"6%",{"key":28,"text":274,"correct":22},"10%",{"key":31,"text":276,"correct":22},"15%",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":28,"analysis":33},1127590,"（2020年真题）根据《水利工程设计变更管理暂行办法》，不需要报原初步设计审批部门审批的设计变更是（）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"主要建筑物形式变化",{"key":24,"text":284,"correct":22},"水库库容变化",{"key":28,"text":286,"correct":26},"堤防工程局部基础处理方案变化",{"key":31,"text":288,"correct":22},"主要料场场地变化",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1127591,"水利工程施工现场用电负荷按其重要性和停电造成的损失程度共分为()类。",[293,294,295,296],{"key":20,"text":121,"correct":22},{"key":24,"text":123,"correct":26},{"key":28,"text":125,"correct":22},{"key":31,"text":297,"correct":22},"五",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1127592,"低温季节混凝土施工时，提高混凝土拌合料温度不能直接加热()。",[302,304,306,308],{"key":20,"text":303,"correct":22},"砂",{"key":24,"text":305,"correct":22},"水",{"key":28,"text":307,"correct":22},"石子",{"key":31,"text":309,"correct":26},"水泥",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1127593,"下列提高混凝土拌合料温度的措施中，错误的是()。",[314,316,318,320],{"key":20,"text":315,"correct":22},"热水拌合",{"key":24,"text":317,"correct":22},"预热细骨料",{"key":28,"text":319,"correct":22},"预热粗骨料",{"key":31,"text":321,"correct":26},"预热水泥",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1127594,"下列施工现场的主要设备用电负荷中，属于一类用电负荷的是（）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"基坑降水",{"key":24,"text":329,"correct":22},"混凝土搅拌系统",{"key":28,"text":331,"correct":22},"钢筋加工厂",{"key":31,"text":333,"correct":22},"机修系统",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1127595,"下列施工用电负荷属一类负荷的是()。",[338,340,342,344],{"key":20,"text":339,"correct":26},"隧洞施工照明",{"key":24,"text":341,"correct":22},"坝基石方开挖",{"key":28,"text":343,"correct":22},"混凝土浇筑施工",{"key":31,"text":331,"correct":22},{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1127596,"某中型泵站工程基础施工期间采用深井降水，此深井降水用电负荷应为()类。",[349,350,351,352],{"key":20,"text":119,"correct":26},{"key":24,"text":121,"correct":22},{"key":28,"text":123,"correct":22},{"key":31,"text":125,"correct":22},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},1127597,"（2018年）下列拌合料预冷方式中，不宜采用的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"冷水拌合",{"key":24,"text":360,"correct":22},"加冰搅拌",{"key":28,"text":362,"correct":22},"预冷骨料",{"key":31,"text":364,"correct":26},"预冷水泥",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1127598,"（2017年）下列水利水电工程施工现场供电部位的负荷中，不属于一类负荷的是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"基坑内排水设施",{"key":24,"text":372,"correct":22},"汛期防洪设施",{"key":28,"text":374,"correct":26},"金属结构及机电安装设备",{"key":31,"text":376,"correct":22},"井内通风系统",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1127599,"（2020年真题）下列用电设施或设备中，属于三类负荷的是（）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"汛期的防洪设施",{"key":24,"text":384,"correct":22},"基坑降排水设备",{"key":28,"text":386,"correct":26},"木材加工厂的主要设备",{"key":31,"text":388,"correct":22},"洞内照明设施",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1127600,"水利工程建筑及安装工程费中，人工费属于()。",[393,395,397,399],{"key":20,"text":394,"correct":26},"直接费",{"key":24,"text":396,"correct":22},"间接费",{"key":28,"text":398,"correct":22},"其他直接费",{"key":31,"text":400,"correct":22},"现场经费",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1127601,"（2019年）根据《水利工程设计概(估)算编制规定(工程部分)》(水总[2014]429号）,下列费用中,不属于工程单价构成要素中“费”的组成部分是( )。",[405,407,408,410],{"key":20,"text":406,"correct":26},"基本直接费",{"key":24,"text":396,"correct":22},{"key":28,"text":409,"correct":22},"企业利润",{"key":31,"text":411,"correct":22},"税金",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1127603,"（2017年）根据《水利工程工程量清单计价规范》（GB 50501-2007），下列费用中，不包含在土方明挖工程单价中，需另行支付的是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"植被清理费",{"key":24,"text":419,"correct":26},"场地平整费",{"key":28,"text":421,"correct":22},"施工超挖费",{"key":31,"text":423,"correct":22},"测量放样费",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1127604,"（2017年）根据《水利工程营业税改征增值税计价依据调整办法》（办水总[2016]132号）的通知，材料价格可以采用将含税价格除以调整系数的方式调整为不含税价格，其中混凝土的调整系数为（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"1.02",{"key":24,"text":431,"correct":26},"1.03",{"key":28,"text":433,"correct":22},"1.04",{"key":31,"text":435,"correct":22},"1.17",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1127605,"根据《水利建设市场主体信用评价暂行办法》（中水协[2009]39号），水利建设市场主体信用等级中，A级表示信用（）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"好",{"key":24,"text":443,"correct":22},"一般",{"key":28,"text":445,"correct":22},"很好",{"key":31,"text":447,"correct":26},"较好",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1127606,"《水利水电工程标准施工招标资格预审文件》中，下列不属于应不加修改引用的是()。",[452,454,456,458],{"key":20,"text":453,"correct":22},"投标人须知",{"key":24,"text":455,"correct":22},"评标办法",{"key":28,"text":457,"correct":22},"通用合同条款",{"key":31,"text":459,"correct":26},"申请人须知",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},1127607,"（2018年）根据《关于印发水利建设市场主体信用评价管理暂行办法的通知》(水建管[2015]377号)，水利建设市场主体信用等级中,BBB级表示信用（）。",[464,465,466,467],{"key":20,"text":441,"correct":22},{"key":24,"text":447,"correct":22},{"key":28,"text":443,"correct":26},{"key":31,"text":468,"correct":22},"差",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},1127608,"（2018年）根据《关于简化建筑业企业资质标准部分指标的通知》(建市[2016]25号)等有关规定,下列关于水利水电工程施工企业资质标准中对建造师数量要求的说法中,正确的是（）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"特级企业注册一级建造师60人以上",{"key":24,"text":476,"correct":22},"一级企业水利水电工程专业注册建造师30人以上",{"key":28,"text":478,"correct":22},"二级企业水利水电工程专业注册建造师15人以上",{"key":31,"text":480,"correct":26},"三级企业水利水电工程专业注册建造师不少于8人",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1127609,"（2018年）根据《住房城乡建设部财政部关于印发建设工程质量保证金管理办法的通知》(建质[2017]138号)保证金总额预留比例不得高于工程价款结算总额（）",[485,487,489,490],{"key":20,"text":486,"correct":22},"2.5%",{"key":24,"text":488,"correct":26},"3%",{"key":28,"text":270,"correct":22},{"key":31,"text":491,"correct":22},"8%",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},1127610,"（2019年）监理人收到承包人索赔通知书后,答复索赔处理结果的时间为(? )天内。",[496,498,500,502],{"key":20,"text":497,"correct":22},"15",{"key":24,"text":499,"correct":22},"28",{"key":28,"text":501,"correct":22},"30",{"key":31,"text":503,"correct":26},"42",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1127611,"（2017年）根据《关于清理规范工程建设领域保证金的通知》（国办发[2016]49号），工程质量保证金的预留比例上限不得高于工程价款结算总额的（ ）。",[508,509,510,512],{"key":20,"text":488,"correct":26},{"key":24,"text":270,"correct":22},{"key":28,"text":511,"correct":22},"7%",{"key":31,"text":513,"correct":22},"9%",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1127612,"根据《水利工程质量监督管理规定》（水建[1997]339号），水利工程建设项目的质量监督期到()截止。",[518,520,522,524],{"key":20,"text":519,"correct":22},"合同工程完工",{"key":24,"text":521,"correct":22},"颁发合同工程完工证书",{"key":28,"text":523,"correct":22},"工程竣工验收",{"key":31,"text":525,"correct":26},"竣工验收委员会同意工程交付使用",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1127613,"从事水利工程()的人员可以担任该项目的兼职质量监督员。",[530,531,532,534],{"key":20,"text":213,"correct":22},{"key":24,"text":215,"correct":22},{"key":28,"text":533,"correct":22},"施工",{"key":31,"text":535,"correct":26},"运行管理",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1127614,"根据《关于贯彻质量发展纲要、提升水利工程质量的实施意见》（水建管[2012]581号），到2015年，大中型水利工程项目一次验收合格率应达到()。",[540,542,544,546],{"key":20,"text":541,"correct":22},"90%",{"key":24,"text":543,"correct":22},"95%",{"key":28,"text":545,"correct":22},"98%",{"key":31,"text":547,"correct":26},"100%",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1127615,"根据《关于贯彻质量发展纲要、提升水利工程质量的实施意见》（水建管[2012]581号），到2015年，大中型水利工程项目一次验收合格率至少应达到（）。",[552,553,554,555],{"key":20,"text":541,"correct":22},{"key":24,"text":543,"correct":22},{"key":28,"text":545,"correct":22},{"key":31,"text":547,"correct":26},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1127616,"水利工程的质量缺陷备案表应由()组织填写。",[560,562,563,564],{"key":20,"text":561,"correct":22},"质量监督单位",{"key":24,"text":164,"correct":26},{"key":28,"text":141,"correct":22},{"key":31,"text":145,"correct":22},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1127617,"水利工程建设项目质量监督方式以()为主。",[569,571,573,575],{"key":20,"text":570,"correct":22},"旁站",{"key":24,"text":572,"correct":22},"巡视",{"key":28,"text":574,"correct":22},"平行检查",{"key":31,"text":576,"correct":26},"抽查",[578,581,584,587,590,593],{"id":15,"name":579,"category":7,"favorite":580},"领导干部任职前廉政法规知识测试题",92,{"id":582,"name":583,"category":7,"favorite":15},595,"建筑结构与设备",{"id":585,"name":586,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":588,"name":589,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":591,"name":592,"category":7,"favorite":8},534,"BIM工程师",{"id":594,"name":592,"category":7,"favorite":8},535]