[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":573},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,20,50,1643,[13,34,46,58,70,82,94,106,118,129,139,151,162,170,180,192,200,208,220,228,240,252,264,276,288,297,309,321,333,341,353,365,377,389,401,413,425,436,448,458,470,482,490,500,512,524,533,541,551,561],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1128426,1,"单选题","施工单位应当在施工组织设计中编制安全技术措施和施工现场临时用电方案，对达到一定规模的危险性较大的工程应当编制专项施工方案，并附具安全验算结果，经施工单位技术负责人签字以及( )核签后实施，由专职安全生产管理人员进行现场监督。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目经理",false,{"key":24,"text":25,"correct":26},"B","总监理工程师",true,{"key":28,"text":29,"correct":22},"C","项目法人",{"key":31,"text":32,"correct":22},"D","国家一级注册安全工程师","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1128427,"项目法人不得调减或挪用批准概算中所确定的水利工程建设有关安全作业环境及安全施工措施等所需费用。工程承包合同中( )安全作业环境及安全施工措施所需费用。",[38,40,42,44],{"key":20,"text":39,"correct":22},"不得明确",{"key":24,"text":41,"correct":26},"应当明确",{"key":28,"text":43,"correct":22},"根据施工需要明确",{"key":31,"text":45,"correct":22},"不提倡明确",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1128428,"根据《安全生产管理规定》，项目法人应当将水利工程中的拆除工程和爆破工程发包给具有相应水利水电工程施工资质等级的施工单位。项目法人应当在拆除工程或者爆破工程施工( )日前，将下列资料报送水行政主管部门、流域管理机构或者其委托的安全生产监督机构备案。",[50,52,54,56],{"key":20,"text":51,"correct":22},"7",{"key":24,"text":53,"correct":22},"14",{"key":28,"text":55,"correct":26},"15",{"key":31,"text":57,"correct":22},"30",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1128429,"某次事故查明死亡人数为4人，直接经济损失约1200万元，则根据《水利工程建设重大质量与安全事故应急预案》（水建管[2006]202号），该次事故为( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"特别重大质量与安全事故",{"key":24,"text":65,"correct":22},"质量与安全事故特大",{"key":28,"text":67,"correct":26},"重大质量与安全事故",{"key":31,"text":69,"correct":22},"质量与安全事故",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1128430,"根据《水利水电工程施工企业负责人、项目负责人和专职安全生产管理人员安全生产考核管理暂行规定》（水建管[2004]168号），水利水电工程施工企业管理人员安全生产考核合格证书有效期为( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"3年",{"key":24,"text":77,"correct":22},"4年",{"key":28,"text":79,"correct":22},"5年",{"key":31,"text":81,"correct":22},"6年",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1128431,"根据《水电水利工程施工重大危险辨识及评价导则》DL\u002FT 5274-2012，依据事故可能造成的人员伤亡数量及财产损失情况，重大危险源共划分为（）级。",[86,88,90,92],{"key":20,"text":87,"correct":22},"2",{"key":24,"text":89,"correct":26},"4",{"key":28,"text":91,"correct":22},"3",{"key":31,"text":93,"correct":22},"5",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1128432,"我国目前工程建设标准分为四级、两类。两类即()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"国家、地方",{"key":24,"text":101,"correct":26},"强制、推荐",{"key":28,"text":103,"correct":22},"国家、行业",{"key":31,"text":105,"correct":22},"行业、企业",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1128433,"启闭机控制开关的端子接线不多于（）导线端子。",[110,112,114,116],{"key":20,"text":111,"correct":26},"2个",{"key":24,"text":113,"correct":22},"3个",{"key":28,"text":115,"correct":22},"4个",{"key":31,"text":117,"correct":22},"5个",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1128434,"设备上的“QS”标志是指（）。 根据《水利部生产安全事故应急预案（试行）》，较大涉险事故是指发生涉险（）人以上。",[122,124,126,127],{"key":20,"text":123,"correct":26},"10",{"key":24,"text":125,"correct":22},"20",{"key":28,"text":57,"correct":22},{"key":31,"text":128,"correct":22},"50",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},1128435,"《水利水电施工企业安全生产标准化评审标准》中，一级评审项目有（）个。",[133,134,136,137],{"key":20,"text":93,"correct":22},{"key":24,"text":135,"correct":22},"6",{"key":28,"text":51,"correct":22},{"key":31,"text":138,"correct":26},"8",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},1128436,"根据劳动部办公厅1993年9月印发的《企业职工伤亡事故报告统计问题解答》，重大质量事故是指一次事故中死亡人数为( )的事故。",[143,145,147,149],{"key":20,"text":144,"correct":22},"1～2人",{"key":24,"text":146,"correct":22},"3～9人",{"key":28,"text":148,"correct":26},"10～30人",{"key":31,"text":150,"correct":22},"50人以上",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},1128437,"根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，阶段验收由( )或其委托单位主持。阶段验收委员会应由验收主持单位、质量和安全监督机构、运行管理单位的代表以及有关专家组成；必要时，可邀请地方政府及有关部门参加。",[155,157,158,160],{"key":20,"text":156,"correct":22},"承包单位",{"key":24,"text":29,"correct":22},{"key":28,"text":159,"correct":22},"分部验收主持单位",{"key":31,"text":161,"correct":26},"竣工验收主持单位",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1128438,"水电站每台机组投入运行前，应进行机组启动（阶段）验收。机组启动运行的主要试验程序和内容应按国家现行标准《水轮发电机组安装技术规范GB8564-88中的有关机组试运行要求进行。水电站的第一台（次）和最后一台（次）机组启动验收由( )主持。",[166,167,168,169],{"key":20,"text":156,"correct":22},{"key":24,"text":29,"correct":22},{"key":28,"text":159,"correct":22},{"key":31,"text":161,"correct":26},{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1128439,"工程档案的归档时间，可由项目法人根据实际情况确定。可分阶段在单位工程或单项工程完工后向项目法人归档，也可在主体工程全部完工后向项目法人归档。整个项目的归档工作和项目法人向有关单位的档案移交工作，应在工程竣工验收后( )个月内完成。",[174,175,176,178],{"key":20,"text":91,"correct":26},{"key":24,"text":135,"correct":22},{"key":28,"text":177,"correct":22},"9",{"key":31,"text":179,"correct":22},"12",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1128440,"验收委员会中，（）以上的委员不同意主任委员对争议问题的裁决意见时，法人验收应报请验收监督管理机关决定。",[184,186,188,190],{"key":20,"text":185,"correct":22},"1\u002F3",{"key":24,"text":187,"correct":26},"1\u002F2",{"key":28,"text":189,"correct":22},"2\u002F3",{"key":31,"text":191,"correct":22},"3\u002F4",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},1128441,"根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，单位工程完工并具备验收条件时，施工单位应向项目法人提出验收申请报告。项目法人应在收到验收申请报告之日()个工作日内决定是否同意进行验收。",[196,197,198,199],{"key":20,"text":123,"correct":26},{"key":24,"text":55,"correct":22},{"key":28,"text":125,"correct":22},{"key":31,"text":93,"correct":22},{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1128442,"竣工验收成果为竣工验收鉴定书，竣工验收鉴定书自通过之日起()个工作日内，应由竣工验收主持单位发送有关单位。",[204,205,206,207],{"key":20,"text":57,"correct":26},{"key":24,"text":125,"correct":22},{"key":28,"text":51,"correct":22},{"key":31,"text":53,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":31,"analysis":33},1128443,"某水利工程竣工验收委员会由9人组成，根据《水利水电建设工程验收规程》(SL223-2008)，验收结论必须经()以上验收委员会成员同意。",[212,214,216,218],{"key":20,"text":213,"correct":22},"3名",{"key":24,"text":215,"correct":22},"4名",{"key":28,"text":217,"correct":22},"5名",{"key":31,"text":219,"correct":26},"6名",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},1128444,"根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，竣工验收应在工程建设项目全部完成并满足一定运行条件后1年内进行。不能按期进行竣工验收的，经竣工验收主持单位同意，可适当延长期限，但最长不得超过( )个月。",[224,225,226,227],{"key":20,"text":91,"correct":22},{"key":24,"text":135,"correct":26},{"key":28,"text":179,"correct":22},{"key":31,"text":177,"correct":22},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1128445,"根据《水利水电建设工程验收规程》(SL223-2008)的有关规定，分部工程验收应由项目法人或( )主持。",[232,234,236,238],{"key":20,"text":233,"correct":26},"委托监理单位",{"key":24,"text":235,"correct":22},"委托承包单位",{"key":28,"text":237,"correct":22},"委托设计单位",{"key":31,"text":239,"correct":22},"委托运行管理单位",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1128446,"根据《水利水电建设工程验收规程(SL223-2008)的规定，填写分部工程验收签证时，存在问题及处理意见中主要填写有关本分部工程( )方面是否存在问题，以及如何处理，处理意见应明确存在问题的处理责任单位等。",[244,246,248,250],{"key":20,"text":245,"correct":26},"质量",{"key":24,"text":247,"correct":22},"进度",{"key":28,"text":249,"correct":22},"投资",{"key":31,"text":251,"correct":22},"质量、进度、投资",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},1128447,"一般情况下，小水电工程在水库蓄水前需要进行( )和水电站征地移民安置验收，",[256,258,260,262],{"key":20,"text":257,"correct":22},"质量核定",{"key":24,"text":259,"correct":22},"外观质量评定",{"key":28,"text":261,"correct":22},"技术性预验收",{"key":31,"text":263,"correct":26},"蓄水安全鉴定",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},1128448,"根据《堤防工程施工质量评定与验收规程》（试行）(SL239-1999)的规定和要求，单元工程（或工序）质量达不到合格标准时，必须及时处理。其质量等级按下列规定确定：全部返工重做的，质量等级( )；经加固补强并经鉴定能达到设计要求的，其质量( )。",[268,270,272,274],{"key":20,"text":269,"correct":22},"合格，合格",{"key":24,"text":271,"correct":26},"重新评定，合格",{"key":28,"text":273,"correct":22},"重新评定，重新评定",{"key":31,"text":275,"correct":22},"合格，重新评定,",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1128449,"根据《水利工程建设项目档案管理规定》的有关规定，水利工程档案的保管期限分为( )。",[280,282,284,286],{"key":20,"text":281,"correct":26},"永久、长期、短期三种",{"key":24,"text":283,"correct":22},"长期、中期、短期三种",{"key":28,"text":285,"correct":22},"长期、短期两种",{"key":31,"text":287,"correct":22},"永久、临时两种",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":28,"analysis":33},1128450,"根据《水利水电建设工程验收规程》(SL 223-2008)的有关规定，验收工作由验收委员会（组）负责，验收结论必须经()以上验收委员会成员同意。",[292,293,294,295],{"key":20,"text":187,"correct":22},{"key":24,"text":191,"correct":22},{"key":28,"text":189,"correct":26},{"key":31,"text":296,"correct":22},"全部",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1128451,"监理机构可采用平行检测方法对承包人的检验结果进行复核。平行检测的检测数量，土方试样不应少于承包人检测数量的( )；重要部位至少取样( )组。",[301,303,305,307],{"key":20,"text":302,"correct":22},"3%，1",{"key":24,"text":304,"correct":26},"5%，3",{"key":28,"text":306,"correct":22},"5%，1",{"key":31,"text":308,"correct":22},"7%，3",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},1128452,"根据《水利工程建设施工监理规范》(SL288-2003)的有关规定，下列不属于监理合同管理工作的是( )。",[313,315,317,319],{"key":20,"text":314,"correct":22},"工程变更",{"key":24,"text":316,"correct":22},"工程分包",{"key":28,"text":318,"correct":22},"工程保险",{"key":31,"text":320,"correct":26},"工程环境",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1128453,"根据《水利工程建设施工监理规范》(SL288-2003)的有关规定，下列不属于监理主要工作制度的是( )。",[325,327,329,331],{"key":20,"text":326,"correct":22},"技术文件审核、审批制度",{"key":24,"text":328,"correct":22},"会议制度",{"key":28,"text":330,"correct":22},"工作报告制度",{"key":31,"text":332,"correct":26},"安全与环境保护制度",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1128454,"根据《水利工程建设施工监理规范》(SL288-2003)，水利工程建设项目施工监理的主要工作方法有( )种。",[337,338,339,340],{"key":20,"text":93,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":138,"correct":22},{"key":31,"text":177,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1128455,"监理对混凝土平行检测时，检测数量应不少于承包人检测数量的（）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"2%",{"key":24,"text":348,"correct":26},"3%",{"key":28,"text":350,"correct":22},"4%",{"key":31,"text":352,"correct":22},"5%",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1128456,"根据《水利工程建设项目施工监理规范》，水利工程建设项目施工监理的主要工作方法中不包括（）",[357,359,361,363],{"key":20,"text":358,"correct":22},"巡视检验",{"key":24,"text":360,"correct":22},"跟踪检测",{"key":28,"text":362,"correct":26},"飞检",{"key":31,"text":364,"correct":22},"平行检测",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1128457,"根据《水利工程建设项目施工监理规范》，施工监理在工程资金控制方面的工作不包括( )",[369,371,373,375],{"key":20,"text":370,"correct":22},"工程资金控制审核承包人提交的资金流计划",{"key":24,"text":372,"correct":22},"对合同工程付款情况进行分析，必要时提出合同工程付款计划调整建议",{"key":28,"text":374,"correct":22},"建立合同工程付款台账",{"key":31,"text":376,"correct":26},"支付合同价款",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1128458,"根据《水电水利工程施工监理规范》DL\u002FT 5111-2012，工程项目划分及开工申报是施工监理（）的基本内容。",[381,383,385,387],{"key":20,"text":382,"correct":22},"工程费用控制",{"key":24,"text":384,"correct":22},"工程进度控制",{"key":28,"text":386,"correct":22},"合同商务管理",{"key":31,"text":388,"correct":26},"工程质量控制",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1128459,"在业主和工程承建合同文件授权的范围内，对工程分包进行审查的单位是（）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"承建单位的主管部门",{"key":24,"text":396,"correct":22},"建设单位",{"key":28,"text":398,"correct":22},"质量监督机构",{"key":31,"text":400,"correct":26},"监理机构",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},1128460,"受项目法人的委托，监理单位按照( )规定在现场独立负责项目的建设工期、质量、投资的控制和现场施工的组织协调工作。",[405,407,409,411],{"key":20,"text":406,"correct":22},"法律",{"key":24,"text":408,"correct":22},"强制性条文",{"key":28,"text":410,"correct":26},"合同",{"key":31,"text":412,"correct":22},"监理规划",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1128461,"水利工程建设监理的主要内容是进行工程建设( )，按照合同控制工程建设的投资、工期和质量，并协调有关各方的工作关系。",[417,419,421,423],{"key":20,"text":418,"correct":26},"合同管理",{"key":24,"text":420,"correct":22},"质量管理",{"key":28,"text":422,"correct":22},"进度管理",{"key":31,"text":424,"correct":22},"全面管理",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1128462,"施工详图经( )审核后交施工单位施工。",[429,430,432,434],{"key":20,"text":29,"correct":22},{"key":24,"text":431,"correct":26},"监理单位",{"key":28,"text":433,"correct":22},"设计单位",{"key":31,"text":435,"correct":22},"质量监督单位",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1128463,"监理机构可采用跟踪检测方法对承包人的检验结果进行复核。跟踪检测的检测数量，混凝土试样不应少于承包人检测数量的( )，土方试样不应少于承包人检测数量的( )。",[440,442,444,446],{"key":20,"text":441,"correct":26},"7%，10%",{"key":24,"text":443,"correct":22},"3%，5%",{"key":28,"text":445,"correct":22},"7%，5%",{"key":31,"text":447,"correct":22},"5%，7%",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":33},1128464,"监理单位采用平行检测方法对承包人的检验结果进行复核，其费用由( )承担。",[452,454,455,457],{"key":20,"text":453,"correct":22},"承包人",{"key":24,"text":431,"correct":22},{"key":28,"text":456,"correct":26},"发包人",{"key":31,"text":398,"correct":22},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},1128465,"根据《水利工程建设项目施工监理规范》，水利工程建设项目施工监理开工条件的控制中不包括（）",[462,464,466,468],{"key":20,"text":463,"correct":26},"签发进场通知",{"key":24,"text":465,"correct":22},"签发开工通知",{"key":28,"text":467,"correct":22},"分部工程开工",{"key":31,"text":469,"correct":22},"单元工程开工",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1128466,"根据《水利工程建设项目施工监理规范》SL 288——2014，关于施工监理开工条件的控制的说法，正确的是（）",[474,476,478,480],{"key":20,"text":475,"correct":22},"第一个单元工程在分部工程开工批准后自行开工",{"key":24,"text":477,"correct":22},"分部工程应在第一个单元开工批准后开工",{"key":28,"text":479,"correct":26},"第一个单元工程在分部工程开工批准后开工",{"key":31,"text":481,"correct":22},"单元工程应在分部工程开工批准后开工",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},1128467,"水力发电工程的工程项目划分一般分为（）级。",[486,487,488,489],{"key":20,"text":87,"correct":22},{"key":24,"text":91,"correct":22},{"key":28,"text":89,"correct":26},{"key":31,"text":93,"correct":22},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1128468,"工程变更指令一般由（）审查、批准后发出。",[494,496,497,498],{"key":20,"text":495,"correct":26},"业主或业主授权监理机构",{"key":24,"text":433,"correct":22},{"key":28,"text":398,"correct":22},{"key":31,"text":499,"correct":22},"承建单位",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1128469,"根据《水工建筑物地下开挖工程施工技术规范》(SDJ 212-83)，下列关于水利水电工程土石方开挖施工的说法错误的是()。",[504,506,508,510],{"key":20,"text":505,"correct":22},"土石方明挖施工，未经安全技术论证和主管部门批准，严禁采用自下而上的开挖方式",{"key":24,"text":507,"correct":26},"大断面隧洞采用先拱后墙法施工时，拱脚线的最低点至下部开挖面的距离，不宜小于1.2m",{"key":28,"text":509,"correct":22},"洞口削坡应自上而下进行，严禁上下垂直作业",{"key":31,"text":511,"correct":22},"特大断面洞室采用先拱后墙法施工时，拱脚线的最低点至下部开挖面的距离不宜小于1.5m",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1128470,"消防要求用火作业区距所建的建筑物和其他区域不得小于()",[516,518,520,522],{"key":20,"text":517,"correct":22},"10m",{"key":24,"text":519,"correct":22},"15m",{"key":28,"text":521,"correct":22},"20m",{"key":31,"text":523,"correct":26},"25m",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1128471,"根据《水工建筑物地下开挖工程施工技术规范》(SDJ 212-83)，洞室开挖时，相向开挖的两个工作面相距()爆破时，双方人员均须撤离工作面。",[528,530,531,532],{"key":20,"text":529,"correct":26},"30m",{"key":24,"text":523,"correct":22},{"key":28,"text":521,"correct":22},{"key":31,"text":519,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1128473,"根据《水电水利工程爆破施工技术规范》DL\u002FT 5135-2013，地下洞室爆破应在爆破后（）min，并经检查确认洞室内空气合格后，方可准许人员进入工作面。",[537,538,539,540],{"key":20,"text":93,"correct":22},{"key":24,"text":123,"correct":22},{"key":28,"text":55,"correct":26},{"key":31,"text":57,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1128474,"根据《水利水电工程施工质量检验与评定规程》SL 176-2007，对涉及工程结构安全的试块、试件及有关材料，其见证取样资料应由（）制备。",[545,547,549,550],{"key":20,"text":546,"correct":22},"检测单位",{"key":24,"text":548,"correct":26},"施工单位",{"key":28,"text":431,"correct":22},{"key":31,"text":29,"correct":22},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1128475,"根据《水工建筑物地下开挖工程施工技术规范(DL\u002FT 5099-1999)，相向开挖的两个工作面相距()时，应停止一方工作，单向开挖贯通。",[555,556,558,559],{"key":20,"text":519,"correct":26},{"key":24,"text":557,"correct":22},"12m",{"key":28,"text":517,"correct":22},{"key":31,"text":560,"correct":22},"8m",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1128476,"根据《水工碾压混凝土施工规范》SL 53-94，连续上升铺筑的碾压混凝土，层间允许间隔时间，应控制在（）以内。",[565,567,569,571],{"key":20,"text":566,"correct":26},"初凝时间",{"key":24,"text":568,"correct":22},"终凝时间",{"key":28,"text":570,"correct":22},"45min",{"key":31,"text":572,"correct":22},"90min",[574,577,580,583,586,589],{"id":15,"name":575,"category":7,"favorite":576},"领导干部任职前廉政法规知识测试题",92,{"id":578,"name":579,"category":7,"favorite":15},595,"建筑结构与设备",{"id":581,"name":582,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":584,"name":585,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":587,"name":588,"category":7,"favorite":8},534,"BIM工程师",{"id":590,"name":588,"category":7,"favorite":8},535]