[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,17,50,1643,[13,34,46,58,66,78,90,102,114,126,138,150,162,170,182,194,206,218,230,242,251,260,268,280,292,301,311,323,335,347,355,366,378,390,402,411,423,435,444,455,467,479,491,503,515,526,538,550,561,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1128275,1,"单选题","水利建筑工程工程量清单共分为( )类。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","12",false,{"key":24,"text":25,"correct":22},"B","13",{"key":27,"text":28,"correct":29},"C","14",true,{"key":31,"text":32,"correct":22},"D","15","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1128276,"为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目为( )。",[38,40,42,44],{"key":20,"text":39,"correct":29},"措施项目",{"key":24,"text":41,"correct":22},"零星工作项目",{"key":27,"text":43,"correct":22},"分类分项工程项目",{"key":31,"text":45,"correct":22},"其他项目",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1128277,"用于编制施工图预算时计算工程造价和计算工程中劳动力、材料、机械台时需要的定额为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概算定额",{"key":24,"text":53,"correct":29},"预算定额",{"key":27,"text":55,"correct":22},"施工定额",{"key":31,"text":57,"correct":22},"投资估算指标",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1128278,"施工企业组织生产和管理在企业内部使用的定额为( )。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":29},{"key":31,"text":57,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":27,"analysis":33},1128279,"推土机推土定额是按自然方拟定的，如推松土时，定额乘( )调整系数。",[70,72,74,76],{"key":20,"text":71,"correct":22},"0.6",{"key":24,"text":73,"correct":22},"0.7",{"key":27,"text":75,"correct":29},"0.8",{"key":31,"text":77,"correct":22},"0.9",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":33},1128280,"挖掘机、轮斗挖掘机或装载机挖装土（含渠道土方）自卸汽车运输定额，适用于Ⅲ类土。Ⅰ、Ⅱ类土人工、机械调整系数均取( )。",[82,84,86,88],{"key":20,"text":83,"correct":22},"0.61",{"key":24,"text":85,"correct":22},"0.71",{"key":27,"text":87,"correct":22},"0.81",{"key":31,"text":89,"correct":29},"0.91",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},1128281,"材料预算价格一般包括材料原价、运杂费、（）、采购及保管费四项。",[94,96,98,100],{"key":20,"text":95,"correct":22},"装卸费",{"key":24,"text":97,"correct":22},"成品保护费",{"key":27,"text":99,"correct":22},"二次搬运费",{"key":31,"text":101,"correct":29},"运输保险费",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},1128282,"暂列金额一般可为分类分项工程项目和措施项目合价的（）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"3%",{"key":24,"text":109,"correct":29},"5%",{"key":27,"text":111,"correct":22},"10%",{"key":31,"text":113,"correct":22},"15%",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},1128283,"根据《水利水电工程施工安全管理导则》SL 721-2015，下列单项工程中，属于超过一定规模的危险性较大的单项工程的是（）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"起重量200kN及以上的起重设备安装工程",{"key":24,"text":121,"correct":29},"开挖深度超过5m（含5m）的基坑的土方开挖、支护、降水工程",{"key":27,"text":123,"correct":22},"开挖深度未超过5m",{"key":31,"text":125,"correct":22},"提升高度100m以上附着式整体和分片提升脚手架工程",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},1128284,"钻孔灌注桩或者沉管灌注桩按施工图纸所示尺寸计算的桩体（）为单位计量，按《工程量清单》相应项目有效工程量的每立方米工程单价支付。",[130,132,134,136],{"key":20,"text":131,"correct":22},"实际桩长以米",{"key":24,"text":133,"correct":29},"有效体积以立方米",{"key":27,"text":135,"correct":22},"有效桩长以米",{"key":31,"text":137,"correct":22},"设计体积以立方米",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1128285,"浆砌石、干砌石、混凝土预制块和砖砌体按施工图纸所示尺寸计算的（）为单位计量，按《工程量清单》相应项目有效工程量的每立方米工程单价支付。",[142,144,146,148],{"key":20,"text":143,"correct":22},"实际砌筑体积以立方米",{"key":24,"text":145,"correct":22},"有效砌筑面积以平方米",{"key":27,"text":147,"correct":29},"有效砌筑体积以立方米",{"key":31,"text":149,"correct":22},"实际砌筑面积以平方米",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},1128286,"处理能力为100t\u002Fh的砂石料加工系统，其生产规模为（）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"特大型",{"key":24,"text":157,"correct":22},"大型",{"key":27,"text":159,"correct":22},"中型",{"key":31,"text":161,"correct":29},"小型",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1128287,"设计生产能力为500m3\u002Fh的混凝土生产系统，其生产规模为（）。",[166,167,168,169],{"key":20,"text":155,"correct":29},{"key":24,"text":157,"correct":22},{"key":27,"text":159,"correct":22},{"key":31,"text":161,"correct":22},{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1128288,"招标投标阶段的混凝土工程量计量时，不予扣除的空洞截面面积是( )。",[174,176,178,180],{"key":20,"text":175,"correct":29},"小于0.1㎡",{"key":24,"text":177,"correct":22},"小于0.2㎡",{"key":27,"text":179,"correct":22},"小于0.3㎡",{"key":31,"text":181,"correct":22},"小于0.4㎡",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":27,"analysis":33},1128289,"根据《水电工程设计概算编制办法及计算标准》（国家经济贸易委员会2002年第78号公告），施工企业为组织施工生产和经营活动所发生的工具用具使用费属于( )。",[186,188,190,192],{"key":20,"text":187,"correct":22},"直接费",{"key":24,"text":189,"correct":22},"其他直接费",{"key":27,"text":191,"correct":29},"间接费",{"key":31,"text":193,"correct":22},"机械费",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},1128290,"坝（堤）体全部完成后，土石方填筑工程量应按( )计算填筑体的有效压实方体积计量。",[198,200,202,204],{"key":20,"text":199,"correct":29},"施工期间压实并经自然沉陷后按施工图纸所示尺寸计算的有效压实方体积",{"key":24,"text":201,"correct":22},"招投标设计图示尺寸加超挖量",{"key":27,"text":203,"correct":22},"招投标设计图示尺寸加施工附加量",{"key":31,"text":205,"correct":22},"招投标设计图示尺寸加沉陷损失",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},1128291,"招投标阶段，现浇混凝土应按招标设计图示尺寸计算的有效实体方体积计量。截面积小于( )的孔洞工程量不予扣除。",[210,212,214,216],{"key":20,"text":211,"correct":29},"0.1平方米",{"key":24,"text":213,"correct":22},"0.2平方米",{"key":27,"text":215,"correct":22},"0.3平方米",{"key":31,"text":217,"correct":22},"0.4平方米",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":20,"analysis":33},1128292,"招投标阶段，混凝土工程单价不包括( )。",[222,224,226,228],{"key":20,"text":223,"correct":29},"以总价支付的混凝土配合比费用",{"key":24,"text":225,"correct":22},"由于超挖引起的超填量的费用",{"key":27,"text":227,"correct":22},"温控措施费",{"key":31,"text":229,"correct":22},"冬期施工增加费",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},1128293,"招投标阶段，砌筑工程的工程量计算下列说法正确的是（）",[234,236,238,240],{"key":20,"text":235,"correct":29},"砌筑工程的砂浆费用，包含在《工程量清单》相应砌筑项目有效工程量的每立方米工程单价中，不另行支付",{"key":24,"text":237,"correct":22},"干砌石的费用包括在相应项目有效工程量的每立方米工程单价中，不另行支付",{"key":27,"text":239,"correct":22},"砌筑工程的拉结筋费用需要另行支付",{"key":31,"text":241,"correct":22},"砌筑工程的砂浆费用不包含在《工程量清单》相应砌筑项目有效工程量的每立方米工程单价中",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":24,"analysis":33},1128294,"根据《水利工程设计概（估）算编制规定》，特殊地区施工增加费属于( )。",[246,247,248,249],{"key":20,"text":187,"correct":22},{"key":24,"text":189,"correct":29},{"key":27,"text":191,"correct":22},{"key":31,"text":250,"correct":22},"现场经费",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},1128295,"根据《水利工程设计概（估）算编制规定》，临时设施费属于( )。",[255,257,258,259],{"key":20,"text":256,"correct":22},"规费",{"key":24,"text":189,"correct":29},{"key":27,"text":191,"correct":22},{"key":31,"text":250,"correct":22},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":27,"analysis":33},1128296,"根据《水利工程设计概（估）算编制规定》，企业管理费属于( )。",[264,265,266,267],{"key":20,"text":187,"correct":22},{"key":24,"text":189,"correct":22},{"key":27,"text":191,"correct":29},{"key":31,"text":250,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},1128297,"某水利工程人工预算单价中级工5元／工时，柴油3.2元／kg，台时一类费用调整系数1.0（已知定额查得第一类费用：42.67元／台时；第二类费用：2.4工时／台时，柴油10.6kg台时），则该74kW推土机的台时费为( )元／台时。",[272,274,276,278],{"key":20,"text":273,"correct":22},"42.67",{"key":24,"text":275,"correct":22},"45.92",{"key":27,"text":277,"correct":29},"88.59",{"key":31,"text":279,"correct":22},"109.65",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1128298,"某水利建筑工程的机电设备安装工程的单价计算中，直接费为Ⅰ，基本直接费为Ⅱ，人工费为Ⅲ，机械使用费其为Ⅳ，他直接费为Ⅴ，已知间接费的费率为η，则间接费为( )。",[284,286,288,290],{"key":20,"text":285,"correct":29},"Ⅰ×η",{"key":24,"text":287,"correct":22},"Ⅱ×η",{"key":27,"text":289,"correct":22},"Ⅲ×η",{"key":31,"text":291,"correct":22},"(Ⅰ+Ⅳ+Ⅴ)×η",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},1128299,"根据《水电工程设计概算编制办法及计算标准》（国家经济贸易委员会2002年第78号公告），企业管理费属于( )。",[296,298,299,300],{"key":20,"text":297,"correct":22},"基本直接费",{"key":24,"text":189,"correct":22},{"key":27,"text":191,"correct":29},{"key":31,"text":250,"correct":22},{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},1128300,"工程定位复测费属于( )。",[305,306,307,309],{"key":20,"text":297,"correct":22},{"key":24,"text":189,"correct":29},{"key":27,"text":308,"correct":22},"安全生产措施费",{"key":31,"text":310,"correct":22},"税金",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},1128301,"根据《水利水电工程施工安全管理导则》SL 721-2015，下列关于单项工程施工的说法，正确的是（）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"开挖深度为5m的基坑的石方开挖工程，不必编制专项施工方案",{"key":24,"text":318,"correct":22},"挡水高度不足3m的围堰工程，不必编制专项施工方案",{"key":27,"text":320,"correct":22},"开挖深度为5m的基坑的土方开挖工程，不必编制专项施工方案",{"key":31,"text":322,"correct":29},"采用爆破拆除的工程，应编制专项施工方案，并应组织专家进行审查",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":20,"analysis":33},1128302,"下列属于基本直接费的是（）",[327,329,331,333],{"key":20,"text":328,"correct":29},"人工费",{"key":24,"text":330,"correct":22},"冬雨期施工增加费",{"key":27,"text":332,"correct":22},"临时设施费",{"key":31,"text":334,"correct":22},"现场管理费",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},1128303,"分类分项工程量清单项目编码500101002001中的后三位001代表的含义是( )。",[339,341,343,345],{"key":20,"text":340,"correct":22},"水利工程顺序码",{"key":24,"text":342,"correct":22},"水利建筑工程顺序码",{"key":27,"text":344,"correct":22},"土方开挖工程顺序码",{"key":31,"text":346,"correct":29},"清单项目名称顺序码",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},1128304,"主要用于初步设计阶段预测工程造价的定额为( )。",[351,352,353,354],{"key":20,"text":51,"correct":29},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},1128305,"零星材料费以费率形式表示，其计算基数为( )。",[359,361,363,365],{"key":20,"text":360,"correct":22},"主要材料费之和",{"key":24,"text":362,"correct":29},"人工费、机械费之和",{"key":27,"text":364,"correct":22},"直接工程费",{"key":31,"text":191,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1128306,"汽车运输定额，适用于水利工程施工路况10km以内的场内运输。运距超过10km，超过部分按增运1km的台时数乘( )系数计算。",[370,372,374,376],{"key":20,"text":371,"correct":22},"0.65",{"key":24,"text":373,"correct":29},"0.75",{"key":27,"text":375,"correct":22},"0.85",{"key":31,"text":377,"correct":22},"0.95",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},1128307,"水利建筑安装工程的施工成本直接费中的其他费用不包括（）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"施工工具用具使用费",{"key":24,"text":385,"correct":22},"工程定位复测费",{"key":27,"text":387,"correct":29},"使用施工道路照明费用",{"key":31,"text":389,"correct":22},"设备仪表移交生产前的维护观察费",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},1128308,"一般土方开挖、淤泥流砂开挖、沟槽开挖和柱坑开挖按施工图纸所示开挖轮廓尺寸计算的（）体积以立方米为单位计量，按《工程量清单》相应项目有效工程量的每立方米工程单价支付。",[394,396,398,400],{"key":20,"text":395,"correct":22},"压实",{"key":24,"text":397,"correct":22},"自然方",{"key":27,"text":399,"correct":29},"有效自然方",{"key":31,"text":401,"correct":22},"松方",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},1128309,"根据《水利工程设计概估算制规定(工程部分）》（水总[2014]429号文），水利工程费用中，直接费不包括（）",[406,408,409,410],{"key":20,"text":407,"correct":22},"施工机械使用费",{"key":24,"text":332,"correct":22},{"key":27,"text":308,"correct":22},{"key":31,"text":250,"correct":29},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1128310,"招标投标阶段的土方回填的工程量的计量应是设计图示尺寸的( )。",[415,417,419,421],{"key":20,"text":416,"correct":22},"压实方体积",{"key":24,"text":418,"correct":29},"有效压实方体积",{"key":27,"text":420,"correct":22},"有效自然方体积",{"key":31,"text":422,"correct":22},"自然方体积",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1128311,"根据《水利水电工程施工安全管理导则》SL 721-2015，除施工单位技术负责人外，还应定期对专项方案实施情况进行巡查的是（）。",[427,429,431,433],{"key":20,"text":428,"correct":29},"总监理工程师",{"key":24,"text":430,"correct":22},"项目法人技术负责人",{"key":27,"text":432,"correct":22},"设计单位技术负责人",{"key":31,"text":434,"correct":22},"监测单位技术负责人",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},1128312,"根据《水利工程设计概（估）算编制规定》，安全生产措施费属于( )。",[439,441,442,443],{"key":20,"text":440,"correct":22},"税费",{"key":24,"text":191,"correct":22},{"key":27,"text":189,"correct":29},{"key":31,"text":250,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1128313,"投标人在递交投标文件的同时，应当递交投标保证金。根据《水利工程建设项目招标投标管理规定》（水利部令第14号），招标人与中标人签订合同后至多( )个工作日内，应当退还投标保证金。",[448,450,452,454],{"key":20,"text":449,"correct":29},"5",{"key":24,"text":451,"correct":22},"7",{"key":27,"text":453,"correct":22},"10",{"key":31,"text":28,"correct":22},{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1128314,"工程量清单应由( )提供。",[459,461,463,465],{"key":20,"text":460,"correct":22},"政府部门",{"key":24,"text":462,"correct":22},"监理单位",{"key":27,"text":464,"correct":29},"招标人",{"key":31,"text":466,"correct":22},"投标人",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1128315,"根据《水利工程建设项目招标投标管理规定》（水利部令第14号），招标人对已发出的招标文件进行必要澄清或者修改的，应当在招标文件要求提交投标文件截止日期至少( )前，以书面形式通知所有投标人。",[471,473,475,477],{"key":20,"text":472,"correct":22},"7日",{"key":24,"text":474,"correct":22},"10日",{"key":27,"text":476,"correct":29},"15日",{"key":31,"text":478,"correct":22},"14日",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},1128316,"某泵站土建标共有甲、乙、丙、丁四家单位购买了招标文件，其中甲、乙、丙参加了由招标人组织的现场踏勘和标前会，现场踏勘中甲单位了提出了招标文件中的疑问，招标人现场进行了答复，根据有关规定，招标人应将解答以书面方式通知( )。",[483,485,487,489],{"key":20,"text":484,"correct":22},"甲",{"key":24,"text":486,"correct":22},"乙、丙",{"key":27,"text":488,"correct":22},"甲、乙、丙",{"key":31,"text":490,"correct":29},"甲、乙、丙、丁",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},1128317,"某次水利工程施工招标中，只有甲、乙两家投标单位递交了投标文件，根据水利工程招标投标有关规定，招标人应当( )。",[495,497,499,501],{"key":20,"text":496,"correct":22},"直接委托给投标人甲或乙",{"key":24,"text":498,"correct":22},"组织议标，然后在甲、乙中确定中标人",{"key":27,"text":500,"correct":22},"组织评标，然后在甲、乙中确定中标人",{"key":31,"text":502,"correct":29},"依法重新招标",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1128318,"根据《水利水电工程标准施工招标文件》（2009年版），合同条款分为“通用合同条款”和“专用合同条款”两部分，两者一旦出现矛盾或不一致，则以( )为准。",[507,509,511,513],{"key":20,"text":508,"correct":22},"通用合同条款",{"key":24,"text":510,"correct":22},"监理人的调解",{"key":27,"text":512,"correct":29},"专用合同条款",{"key":31,"text":514,"correct":22},"行政监督人的调解",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1128319,"提交投标文件的投标人少于（）个时，招标人应依法重新招标。",[519,521,523,525],{"key":20,"text":520,"correct":22},"2",{"key":24,"text":522,"correct":29},"3",{"key":27,"text":524,"correct":22},"4",{"key":31,"text":449,"correct":22},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1128320,"信用等级为CCC级表示( )。",[530,532,534,536],{"key":20,"text":531,"correct":22},"信用好",{"key":24,"text":533,"correct":22},"信用较好",{"key":27,"text":535,"correct":22},"信用一般",{"key":31,"text":537,"correct":29},"信用较差",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1128321,"如果澄清和修改通知发出的时间距投标截止时间不足（? ）天，且影响投标文件编制的，相应延长投标截止时间。",[542,544,546,548],{"key":20,"text":543,"correct":22},"20天",{"key":24,"text":545,"correct":29},"15天",{"key":27,"text":547,"correct":22},"25天",{"key":31,"text":549,"correct":22},"30天",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1128322,"委托招标事项应当在委托合同中明确，（ ）承担委托责任",[554,555,557,559],{"key":20,"text":464,"correct":29},{"key":24,"text":556,"correct":22},"行政监督人",{"key":27,"text":558,"correct":22},"监察人",{"key":31,"text":560,"correct":22},"评标专家",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1128323,"根据《工程建设项目施工招标投标办法》（国家八部委局第30号令），自招标文件或者资格预审文件出售之日起至停止出售之日止，最短不得少于( )日。",[565,566,568,569],{"key":20,"text":449,"correct":29},{"key":24,"text":567,"correct":22},"6",{"key":27,"text":451,"correct":22},{"key":31,"text":570,"correct":22},"8",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1128324,"根据《工程建设项目施工招标投标办法》（国家八部委局第30号令），工程施工招标分为( )。",[575,577,579,581],{"key":20,"text":576,"correct":22},"公开招标、邀请招标和议标",{"key":24,"text":578,"correct":22},"公开招标和议标",{"key":27,"text":580,"correct":22},"邀请招标和议标",{"key":31,"text":582,"correct":29},"公开招标和邀请招标",[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]