[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,15,50,1643,[13,34,46,58,70,82,94,106,118,130,142,151,163,175,187,195,207,215,227,235,243,251,259,271,280,290,302,314,326,338,349,361,373,385,397,409,421,433,445,457,469,481,493,503,515,527,539,551,562,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1128174,1,"单选题","闸门安装合格后，应在无水情况下作（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","静载试验",false,{"key":24,"text":25,"correct":22},"B","动水启闭试验",{"key":27,"text":28,"correct":22},"C","动水关闭试验",{"key":30,"text":31,"correct":32},"D","全行程启闭试验",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1128175,"平面闸门安装流程的最后一步是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"按照预埋件调配止水和支承导向部件",{"key":24,"text":41,"correct":22},"安装闸门拉杆",{"key":27,"text":43,"correct":22},"在门槽内试验闸门的提升和关闭",{"key":30,"text":45,"correct":32},"将闸门处于试验水头并投入运行",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1128176,"弧形闸门吊装包括：①支臂吊装；②附件安装；③穿铰轴；④门叶吊装；⑤门叶与支臂相连，下列吊装顺序正确的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"①②③④⑤",{"key":24,"text":53,"correct":22},"②①③④⑤",{"key":27,"text":55,"correct":32},"①③④⑤②",{"key":30,"text":57,"correct":22},"②①④③⑤",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1128177,"有底座机组安装，先将底座放于浇筑好的基础上，套上地脚螺丝和螺帽，调整位置。底座的纵横中心位置和浇筑基础时所定的纵横中心线误差不能超过( )。",[62,64,66,68],{"key":20,"text":63,"correct":32},"±5mm",{"key":24,"text":65,"correct":22},"±4mm",{"key":27,"text":67,"correct":22},"±2mm",{"key":30,"text":69,"correct":22},"±1mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1128178,"水泵安装时，无底座直接传动的卧式机组安装的流程顺序正确的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"校正一吊水泵一水泵安装一动力机安装一验收",{"key":24,"text":77,"correct":32},"吊水泵一校正一水泵安装一动力机安装一验收",{"key":27,"text":79,"correct":22},"吊水泵一校正一水泵安装一验收一动力机安装",{"key":30,"text":81,"correct":22},"校正一吊水泵一水泵安装一验收一动力机安装",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1128179,"测量与调整传动轴、泵轴摆度，目的是使机组轴线各部位的最大摆度在规定的允许范围内。当测算出的摆度值不满足规定的要求时，通常是采用（）的方法进行调整。",[86,88,90,92],{"key":20,"text":87,"correct":22},"水平校正",{"key":24,"text":89,"correct":22},"同心校正",{"key":27,"text":91,"correct":32},"刮磨推力盘底面",{"key":30,"text":93,"correct":22},"地脚螺栓调整",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1128180,"下列设备中，不属于水泵机组的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"水泵",{"key":24,"text":101,"correct":32},"接力器",{"key":27,"text":103,"correct":22},"动力机",{"key":30,"text":105,"correct":22},"传动设备",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1128181,"电力起爆中，供给每个电雷管的实际电流应大于准爆电流，下列要求错误的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"直流电源：一般爆破不小于2.5A",{"key":24,"text":113,"correct":32},"直流电源：洞室爆破或大规模爆破不小于3.5A",{"key":27,"text":115,"correct":22},"交流电源：一般爆破不小于3A",{"key":30,"text":117,"correct":22},"交流电源：对于洞室爆破或大规模爆破不小于4A",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1128182,"地下相向开挖的两端在相距( )m以内时，装炮前应通知另一端暂停工作。",[122,124,126,128],{"key":20,"text":123,"correct":22},"60",{"key":24,"text":125,"correct":22},"50",{"key":27,"text":127,"correct":22},"40",{"key":30,"text":129,"correct":32},"30",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1128183,"气温低于( )℃运输易冻的硝化甘油炸药时，应采取防冻措施。",[134,136,138,140],{"key":20,"text":135,"correct":22},"7",{"key":24,"text":137,"correct":22},"8",{"key":27,"text":139,"correct":22},"9",{"key":30,"text":141,"correct":32},"10",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1128184,"遇有( )级及以上的大风，禁止从事高处作业。",[146,148,149,150],{"key":20,"text":147,"correct":32},"6",{"key":24,"text":135,"correct":22},{"key":27,"text":137,"correct":22},{"key":30,"text":139,"correct":22},{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1128185,"钢脚手架的立杆的间距不大于( )m。",[155,157,159,161],{"key":20,"text":156,"correct":32},"2.0",{"key":24,"text":158,"correct":22},"1.8",{"key":27,"text":160,"correct":22},"1.5",{"key":30,"text":162,"correct":22},"1.2",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1128186,"质量合格的塑料安全帽应在( )℃下不变形。",[167,169,171,173],{"key":20,"text":168,"correct":32},"120",{"key":24,"text":170,"correct":22},"150",{"key":27,"text":172,"correct":22},"180",{"key":30,"text":174,"correct":22},"200",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1128187,"在( )m以下高度进行工作时，可使用牢固的梯子或高凳。",[179,181,183,185],{"key":20,"text":180,"correct":32},"2",{"key":24,"text":182,"correct":22},"3",{"key":27,"text":184,"correct":22},"4",{"key":30,"text":186,"correct":22},"5",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1128188,"高处作业的安全网距离工作面的最大高度不超过( )m。",[191,192,193,194],{"key":20,"text":180,"correct":22},{"key":24,"text":182,"correct":32},{"key":27,"text":184,"correct":22},{"key":30,"text":186,"correct":22},{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":30,"analysis":33},1128189,"高度在20m处的作业属于( )高处作业。",[199,201,203,205],{"key":20,"text":200,"correct":22},"特级",{"key":24,"text":202,"correct":22},"一级",{"key":27,"text":204,"correct":22},"二级",{"key":30,"text":206,"correct":32},"三级",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1128190,"凡在坠落高度基准面( )m以上有可能坠落的高处进行作业，均称为高处作业。",[211,212,213,214],{"key":20,"text":180,"correct":32},{"key":24,"text":182,"correct":22},{"key":27,"text":184,"correct":22},{"key":30,"text":186,"correct":22},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":27,"analysis":33},1128191,"下列关于特殊场所照明器具安全电压的规定正确的是( )。",[219,221,223,225],{"key":20,"text":220,"correct":22},"地下工程，有高温、导电灰尘，且灯具离地面高度低于2.5m等场所的照明，电源电压应不大于48V",{"key":24,"text":222,"correct":22},"在潮湿和易触及带电体场所的照明电源电压不得大于12V",{"key":27,"text":224,"correct":32},"地下工程，有高温、导电灰尘，且灯具离地面高度低于2.5m等场所的照明，电源电压应不大于36V",{"key":30,"text":226,"correct":22},"在潮湿和易触及带电体场所的照明电源电压不得大于36V",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":20,"analysis":33},1128192,"旋转臂架式起重机的任何部位或被吊物边缘与10kV以下的架空线路边线最小水平距离不得小于( )m。",[231,232,233,234],{"key":20,"text":180,"correct":32},{"key":24,"text":182,"correct":22},{"key":27,"text":184,"correct":22},{"key":30,"text":186,"correct":22},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},1128193,"机械如在220kV高压线下进行工作或通过时，其最高点与高压线之间的最小垂直距离不得小于( )m。",[239,240,241,242],{"key":20,"text":184,"correct":22},{"key":24,"text":186,"correct":22},{"key":27,"text":147,"correct":32},{"key":30,"text":135,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1128194,"在建工程（含脚手架）的外侧边缘与外电架空线路(电压35-110kV)的边线之间应保持安全操作距离是( )m。",[247,248,249,250],{"key":20,"text":184,"correct":22},{"key":24,"text":147,"correct":22},{"key":27,"text":137,"correct":32},{"key":30,"text":141,"correct":22},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},1128195,"施工现场的机动车道与外电架空线路(电压1—10kV)交叉时，架空线路的最低点与路面的垂直距离应不小于( )m。",[255,256,257,258],{"key":20,"text":147,"correct":22},{"key":24,"text":135,"correct":32},{"key":27,"text":137,"correct":22},{"key":30,"text":139,"correct":22},{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":30,"analysis":33},1128196,"水利水电工程施工生产区内机动车辆行驶道路最小转弯半径不得小于( )m。",[263,265,267,269],{"key":20,"text":264,"correct":22},"12",{"key":24,"text":266,"correct":22},"13",{"key":27,"text":268,"correct":22},"14",{"key":30,"text":270,"correct":32},"15",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1128197,"加油站应安装覆盖站区的避雷装置，其接地电阻不大于( )Ω。",[275,276,277,278],{"key":20,"text":186,"correct":22},{"key":24,"text":141,"correct":32},{"key":27,"text":270,"correct":22},{"key":30,"text":279,"correct":22},"20",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":30,"analysis":33},1128198,"根据施工生产防火安全的需要，合理布置消防通道和各种防火标志，消防通道应保持通畅，宽度不得小于( )m。",[284,285,287,288],{"key":20,"text":186,"correct":22},{"key":24,"text":286,"correct":22},"4.5",{"key":27,"text":184,"correct":22},{"key":30,"text":289,"correct":32},"3.5",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1128199,"漫溢险情抢护时，各种子堤的外脚一般都应距围堰外肩( )m。",[294,296,298,300],{"key":20,"text":295,"correct":22},"0.2～0.5",{"key":24,"text":297,"correct":32},"0.5～1.0",{"key":27,"text":299,"correct":22},"1.0～1.3",{"key":30,"text":301,"correct":22},"1.5～2.0",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":30,"analysis":33},1128200,"实际洪水位超过现有堰顶高程，洪水漫进基坑内的现象称为( )。",[306,308,310,312],{"key":20,"text":307,"correct":22},"管涌",{"key":24,"text":309,"correct":22},"流土",{"key":27,"text":311,"correct":22},"漏洞",{"key":30,"text":313,"correct":32},"漫溢",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1128201,"管涌险情抢护时，围井内必须用( )铺填。",[318,320,322,324],{"key":20,"text":319,"correct":22},"砂石反滤料",{"key":24,"text":321,"correct":22},"土工织物",{"key":27,"text":323,"correct":32},"透水性材料",{"key":30,"text":325,"correct":22},"不透水性材料",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1128202,"抢护管涌险情的原则应是( )。",[330,332,334,336],{"key":20,"text":331,"correct":22},"水涨堤高",{"key":24,"text":333,"correct":22},"上堵下排",{"key":27,"text":335,"correct":32},"防止涌水带砂",{"key":30,"text":337,"correct":22},"集中力量，堵死进口",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1128203,"汛期来临，漏洞险情发生时，堵塞( )是最有效、最常用的方法。",[342,344,346,348],{"key":20,"text":343,"correct":32},"漏洞进口",{"key":24,"text":345,"correct":22},"漏洞出口",{"key":27,"text":347,"correct":22},"漏洞中部",{"key":30,"text":333,"correct":22},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":27,"analysis":33},1128204,"堰顶高程的确定，取决于施工期水位及围堰的( )。",[353,355,357,359],{"key":20,"text":354,"correct":22},"种类",{"key":24,"text":356,"correct":22},"材料",{"key":27,"text":358,"correct":32},"工作条件",{"key":30,"text":360,"correct":22},"使用年限",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":30,"analysis":33},1128205,"3级土石围堰的安全超高，一般对于过水围堰( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"取0.3m",{"key":24,"text":368,"correct":22},"取0.4m",{"key":27,"text":370,"correct":22},"取0.5m",{"key":30,"text":372,"correct":32},"可不予考虑",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},1128206,"围堰是保护水工建筑物干地施工的必要( )。",[377,379,381,383],{"key":20,"text":378,"correct":32},"挡水建筑物",{"key":24,"text":380,"correct":22},"泄水建筑物",{"key":27,"text":382,"correct":22},"过水建筑物",{"key":30,"text":384,"correct":22},"不过水建筑物",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},1128207,"围堰是保护大坝或厂房等水工建筑物干地施工的必要挡水建筑物，一般属( )的工程。",[389,391,393,395],{"key":20,"text":390,"correct":32},"临时性",{"key":24,"text":392,"correct":22},"永久性",{"key":27,"text":394,"correct":22},"固定性",{"key":30,"text":396,"correct":22},"非固定性",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1128208,"在河岸或河滩上开挖渠道，在基坑的上下游修建横向围堰，河道的水流经渠道下泄，这种导流方法称为( )。",[401,403,405,407],{"key":20,"text":402,"correct":32},"明渠导流",{"key":24,"text":404,"correct":22},"隧洞导流",{"key":27,"text":406,"correct":22},"涵管导流",{"key":30,"text":408,"correct":22},"束窄河床导流",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},1128209,"下列不属于导流标准的是（）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"导流建筑物级别",{"key":24,"text":416,"correct":22},"导流洪水标准",{"key":27,"text":418,"correct":32},"导流时段",{"key":30,"text":420,"correct":22},"施工期临时度汛标准",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":30,"analysis":33},1128210,"在截流中，截流材料的尺寸或重量取决于龙口( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"流量",{"key":24,"text":428,"correct":22},"尺寸",{"key":27,"text":430,"correct":22},"落差",{"key":30,"text":432,"correct":32},"流速",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":30,"analysis":33},1128212,"选择截流方法时，不需要进行( )。",[437,439,441,443],{"key":20,"text":438,"correct":22},"水力学参数计算",{"key":24,"text":440,"correct":22},"分析施工条件和难度",{"key":27,"text":442,"correct":22},"考虑抛投物数量和性质",{"key":30,"text":444,"correct":32},"截流材料的价格",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},1128213,"先在龙口建造浮桥或栈桥，由自卸汽车或其他运输工具运来抛投料，沿龙口前沿投抛的截流方法是( )。",[449,451,453,455],{"key":20,"text":450,"correct":22},"立堵",{"key":24,"text":452,"correct":32},"平堵",{"key":27,"text":454,"correct":22},"混合堵",{"key":30,"text":456,"correct":22},"抛投块料堵",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":30,"analysis":33},1128214,"下列不属于截流基本方法的是( )。",[461,463,465,467],{"key":20,"text":462,"correct":22},"抛投块石截流",{"key":24,"text":464,"correct":22},"爆破截流",{"key":27,"text":466,"correct":22},"下闸截流",{"key":30,"text":468,"correct":32},"水下现浇混凝土截流",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},1128215,"按照《水库大坝安全鉴定办法》，病险水库是指大坝通过规定程序确定为( )的水库。",[473,475,477,479],{"key":20,"text":474,"correct":22},"一类坝",{"key":24,"text":476,"correct":22},"二类坝",{"key":27,"text":478,"correct":22},"二类坝或三类坝",{"key":30,"text":480,"correct":32},"三类坝",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":30,"analysis":33},1128216,"下列属于委托合同的是（）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"勘查合同",{"key":24,"text":488,"correct":22},"设计合同",{"key":27,"text":490,"correct":22},"施工合同",{"key":30,"text":492,"correct":32},"监理合同",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1128217,"水库蓄水安全鉴定的范围不包含（）。",[497,499,500,501],{"key":20,"text":498,"correct":32},"桥梁建筑物",{"key":24,"text":378,"correct":22},{"key":27,"text":380,"correct":22},{"key":30,"text":502,"correct":22},"引水建筑物进水口工程",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},1128218,"水利工程建设项目按其功能分为公益性、准公益性和( )。",[507,509,511,513],{"key":20,"text":508,"correct":22},"社会性",{"key":24,"text":510,"correct":32},"经营性",{"key":27,"text":512,"correct":22},"群众性",{"key":30,"text":514,"correct":22},"广泛性",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1128219,"监理单位在性质上是( )进行的一种监督。",[519,521,523,525],{"key":20,"text":520,"correct":32},"项目法人的委托人",{"key":24,"text":522,"correct":22},"行政主管部门的委托人",{"key":27,"text":524,"correct":22},"施工单位的委托人",{"key":30,"text":526,"correct":22},"质量监督机构",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1128220,"建设项目管理“三项”制度中，对招标的实施最具推动作用的是（）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"项目法人责任制",{"key":24,"text":534,"correct":32},"招标投标制",{"key":27,"text":536,"correct":22},"建设监理制",{"key":30,"text":538,"correct":22},"合同管理制",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":27,"analysis":33},1128221,"重大设计变更文件编制的设计深度应满足（）阶段技术标准的要求。",[543,545,547,549],{"key":20,"text":544,"correct":22},"项目建议书",{"key":24,"text":546,"correct":22},"可行性研究",{"key":27,"text":548,"correct":32},"初步设计",{"key":30,"text":550,"correct":22},"招标设计",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1128222,"根据《关于水利工程建设项目代建制管理的指导意见》，拟实施代建制的项目应在（）中提出实行代建制管理的方案。",[555,556,558,560],{"key":20,"text":544,"correct":22},{"key":24,"text":557,"correct":32},"可行性研究报告",{"key":27,"text":559,"correct":22},"初步设计报告",{"key":30,"text":561,"correct":22},"工程开工申请报告",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":30,"analysis":33},1128223,"根据《关于调整水利工程建设项目施工准备开工条件的通知》（水建管[2017]177号），水利工程项目在进行施工准备前必须满足的条件中不包括（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"项目可行性研究报告已经批准",{"key":24,"text":569,"correct":22},"建设资金已落实",{"key":27,"text":571,"correct":22},"环境影响评价文件等已经批准",{"key":30,"text":573,"correct":32},"项目初步设计报告已经批复",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1128224,"下列工程按照《工程建设项目招标投标办法》规定，必须进行招标的是( )。",[578,580,582,584],{"key":20,"text":579,"correct":22},"需要采用不可替代的专利或者专有技术",{"key":24,"text":581,"correct":22},"采购人依法能够自行建设、生产或者提供",{"key":27,"text":583,"correct":32},"国家重点水利项目",{"key":30,"text":585,"correct":22},"已通过招标方式选定的特许经营项目投资人依法能够自行建设、生产或者提供",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]