[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-793-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},793,"二建水利水电实务","建筑工程",0,13,50,1643,[13,34,46,56,65,73,82,94,106,114,122,134,146,158,170,182,194,206,218,230,242,254,266,278,290,302,314,324,336,347,359,371,383,395,407,418,428,440,452,464,476,488,500,512,522,534,546,558,568,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1128074,1,"单选题","地基处理方法中防渗墙主要适用于( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","岩基",false,{"key":24,"text":25,"correct":22},"B","膨胀土地基",{"key":27,"text":28,"correct":29},"C","砂砾石地基",true,{"key":31,"text":32,"correct":22},"D","软土地基","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1128075,"可将裂缝粘合起来或形成凝胶，起到堵水防渗以及补强的作用的灌浆方法是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"固结灌浆",{"key":24,"text":41,"correct":22},"帷幕灌浆",{"key":27,"text":43,"correct":22},"接触灌浆",{"key":31,"text":45,"correct":29},"化学灌浆",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1128076,"在灌浆孔深度较大，孔内岩性又有一定变化而裂隙又大的情况下通常用( )。",[50,52,53,54],{"key":20,"text":51,"correct":22},"一次灌浆",{"key":24,"text":41,"correct":22},{"key":27,"text":39,"correct":22},{"key":31,"text":55,"correct":29},"分段灌浆",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":27,"analysis":33},1128077,"( )是来用钻孔将装上特制合金喷嘴的注浆管下到预定位置，然后用高压泵将浆液通过喷嘴喷射出来，冲击破坏土体，使土粒在喷射流束的冲击力、离心力和重力等综合作用下，与浆液搅拌混合。待浆液凝固以后，在土内就形成一定形状的固结体。",[60,61,62,64],{"key":20,"text":39,"correct":22},{"key":24,"text":45,"correct":22},{"key":27,"text":63,"correct":29},"高压喷射灌浆",{"key":31,"text":41,"correct":22},{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":31,"analysis":33},1128078,"以高分子有机化合物为主体材料的灌浆方法称为( )。",[69,70,71,72],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":29},{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":31,"analysis":33},1128079,"可以改善岩基的力学性能，减少基础的变形和不均匀沉陷的灌浆方法是( )。",[77,79,80,81],{"key":20,"text":78,"correct":22},"开挖回填",{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":39,"correct":29},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1128080,"遇到易风化的页岩、黏土岩时，应留有（）的保护层，待浇筑混凝土前再挖除。",[86,88,90,92],{"key":20,"text":87,"correct":22},"0.1～0.15m",{"key":24,"text":89,"correct":29},"0.2～0.3m",{"key":27,"text":91,"correct":22},"0.4～0.5m",{"key":31,"text":93,"correct":22},"0.5～0.6m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1128081,"混凝土坝地地基的开挖与清理过程中，如果两岸岸坡坝段基岩面，尽量开挖成( )",[98,100,102,104],{"key":20,"text":99,"correct":22},"宜开挖成台阶状",{"key":24,"text":101,"correct":29},"挖成有足够宽度的台阶状",{"key":27,"text":103,"correct":22},"溶蚀面应尽量挖除",{"key":31,"text":105,"correct":22},"小台阶状",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1128082,"通过面状布孔灌浆，改善岩基的力学性能，减少基础的变形，以减少基础开挖深度的一种灌浆方法是( )。",[110,111,112,113],{"key":20,"text":39,"correct":29},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":63,"correct":22},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},1128083,"在平行于建筑物的轴线方向，向基础内钻一排或几排孔，用压力灌浆法将浆液灌入到岩石的裂隙中去，形成一道防渗帷幕，截断基础渗流，降低基础扬压力的灌浆方法是( )。",[118,119,120,121],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":43,"correct":22},{"key":31,"text":63,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1128084,"采用挖坑灌水（砂）法测堆石料密度，其试坑直径最大不超过（）m。",[126,128,130,132],{"key":20,"text":127,"correct":22},"1",{"key":24,"text":129,"correct":29},"2",{"key":27,"text":131,"correct":22},"3",{"key":31,"text":133,"correct":22},"4",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":31,"analysis":33},1128085,"( )的情况与主堆石相似，但对密度的要求相对较低",[138,140,142,144],{"key":20,"text":139,"correct":22},"垫层",{"key":24,"text":141,"correct":22},"过渡",{"key":27,"text":143,"correct":22},"主堆石",{"key":31,"text":145,"correct":29},"下游堆石",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1128086,"一般堆石体压实的质量指标用（）表示。",[150,152,154,156],{"key":20,"text":151,"correct":29},"孔隙率",{"key":24,"text":153,"correct":22},"压实度",{"key":27,"text":155,"correct":22},"相对密度",{"key":31,"text":157,"correct":22},"表现密度",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":27,"analysis":33},1128087,"一般堆石体最大粒径不应超过层厚的( )。",[162,164,166,168],{"key":20,"text":163,"correct":22},"1\u002F2",{"key":24,"text":165,"correct":22},"1\u002F3",{"key":27,"text":167,"correct":29},"2\u002F3",{"key":31,"text":169,"correct":22},"3\u002F4",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1128088,"后退法的优点是( )。",[174,176,178,180],{"key":20,"text":175,"correct":29},"减轻轮胎磨损",{"key":24,"text":177,"correct":22},"推土机摊平工作量小",{"key":27,"text":179,"correct":22},"使堆石填筑速度加快",{"key":31,"text":181,"correct":22},"虽料物稍有分离，但对坝料质量无明显影响",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1128089,"堆石坝坝体的过渡区的过渡料需要做过渡性检查，取样部位为（）。",[186,188,190,192],{"key":20,"text":187,"correct":29},"界面处",{"key":24,"text":189,"correct":22},"中上部",{"key":27,"text":191,"correct":22},"最中部",{"key":31,"text":193,"correct":22},"最底层",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1128090,"堆石坝坝体中，垫层区中垫层料最大粒径为( )。",[198,200,202,204],{"key":20,"text":199,"correct":22},"不超过80mm",{"key":24,"text":201,"correct":29},"80~100mm",{"key":27,"text":203,"correct":22},"100~300mm",{"key":31,"text":205,"correct":22},"1000~1500mm",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":27,"analysis":33},1128091,"一般堆石坝坝体过渡料的最大粒径不超过( )。",[210,212,214,216],{"key":20,"text":211,"correct":22},"80-100mm",{"key":24,"text":213,"correct":22},"200mm",{"key":27,"text":215,"correct":29},"300mm",{"key":31,"text":217,"correct":22},"400mm",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":31,"analysis":33},1128092,"大坝土料干密度的测定，以下说法正确的是( )。",[222,224,226,228],{"key":20,"text":223,"correct":22},"黏性土可用体积为180立方厘米的环刀测定",{"key":24,"text":225,"correct":22},"砂可用体积为300立方厘米的环刀测定",{"key":27,"text":227,"correct":22},"堆石一般用灌砂法",{"key":31,"text":229,"correct":29},"砂砾料、反滤料用灌水法",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},1128093,"在坝面作业中，对堆石干密度一般采用（）方法测定。",[234,236,238,240],{"key":20,"text":235,"correct":22},"环刀取样法",{"key":24,"text":237,"correct":22},"挖坑取样法",{"key":27,"text":239,"correct":29},"灌水法",{"key":31,"text":241,"correct":22},"灌砂法",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1128094,"在填筑排水反滤层过程中，每层在25mX25m的面积内取样( )",[246,248,250,252],{"key":20,"text":247,"correct":29},"1~2",{"key":24,"text":249,"correct":22},"2~3",{"key":27,"text":251,"correct":22},"3~4",{"key":31,"text":253,"correct":22},"4~5",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},1128095,"在坝面作业中，对于黏性土，要做干密度、含水量等检查；其中干密度的测定一般用体积为（）cm3的环刀取样测定。",[258,260,262,264],{"key":20,"text":259,"correct":22},"100~200",{"key":24,"text":261,"correct":22},"200~400",{"key":27,"text":263,"correct":29},"200~500",{"key":31,"text":265,"correct":22},"300~500",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1128096,"土石坝采用进退错距法施工，若施工工作面宽3.0m，碾压机械碾滚净宽1.5m，设计碾压遍数为5遍，则错距碾压宽度为（）。",[270,272,274,276],{"key":20,"text":271,"correct":29},"0.3",{"key":24,"text":273,"correct":22},"0.5",{"key":27,"text":275,"correct":22},"0.6",{"key":31,"text":277,"correct":22},"2.0",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1128097,"在坝体填筑中，各分段之间不应形成过大的高差，接坡坡比一般缓于（）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"1:2",{"key":24,"text":285,"correct":29},"1:3",{"key":27,"text":287,"correct":22},"2:3",{"key":31,"text":289,"correct":22},"1:4",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},1128098,"贯穿于土石坝施工的各个环节和施工全过程的是( )。",[294,296,298,300],{"key":20,"text":295,"correct":29},"施工质量检查和控制",{"key":24,"text":297,"correct":22},"施工监督",{"key":27,"text":299,"correct":22},"施工前的准备工作",{"key":31,"text":301,"correct":22},"施工中的安全第一原则",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1128099,"具有生产效率高等优点的碾压机械开行方式是( )。",[306,308,310,312],{"key":20,"text":307,"correct":22},"进退错距法",{"key":24,"text":309,"correct":29},"圈转套压法",{"key":27,"text":311,"correct":22},"进退平距法",{"key":31,"text":313,"correct":22},"圈转碾压法",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},1128100,"操作简便，碾压、铺土和质检等工序协调，压实质量容易保证的碾压机械的开行方式是( )。",[318,320,321,323],{"key":20,"text":319,"correct":22},"平行碾压法",{"key":24,"text":309,"correct":22},{"key":27,"text":322,"correct":22},"分段碾压法",{"key":31,"text":307,"correct":29},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},1128101,"对土料场的质量检查和控制中，( )的检查和控制最为重要。",[328,330,332,334],{"key":20,"text":329,"correct":22},"土块大小",{"key":24,"text":331,"correct":22},"杂质含量",{"key":27,"text":333,"correct":29},"含水量",{"key":31,"text":335,"correct":22},"土质情况",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1128102,"某坝面碾压施工设计碾压遍数为5遍，碾滚净宽为4m，则错距宽度为( )m。",[340,341,343,345],{"key":20,"text":273,"correct":22},{"key":24,"text":342,"correct":29},"0.8",{"key":27,"text":344,"correct":22},"1.0",{"key":31,"text":346,"correct":22},"1.5",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},1128103,"土石坝工作面的划分，应尽可能( )。",[351,353,355,357],{"key":20,"text":352,"correct":22},"垂直坝轴线方向",{"key":24,"text":354,"correct":29},"平行坝轴线方向",{"key":27,"text":356,"correct":22},"根据施工方便灵活设置",{"key":31,"text":358,"correct":22},"不需考虑压实机械工作条件",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},1128104,"坝面作业保证压实质量的关键要求是( )。",[363,365,367,369],{"key":20,"text":364,"correct":22},"铺料均匀",{"key":24,"text":366,"correct":29},"按设计厚度铺料平整",{"key":27,"text":368,"correct":22},"铺料宜平行坝轴线进行",{"key":31,"text":370,"correct":22},"采用推土机散料平土",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1128105,"碾压土石坝的基本作业不包括( )等内容。",[375,377,379,381],{"key":20,"text":376,"correct":29},"排水清基",{"key":24,"text":378,"correct":22},"坝面铺平",{"key":27,"text":380,"correct":22},"坝面压实",{"key":31,"text":382,"correct":22},"料场土石料的开采",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1128106,"碾压土石坝施工中的坝坡修整属于( )的内容。",[387,389,391,393],{"key":20,"text":388,"correct":22},"准备作业",{"key":24,"text":390,"correct":22},"基本作业",{"key":27,"text":392,"correct":22},"辅助作业",{"key":31,"text":394,"correct":29},"附加作业",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},1128107,"黏性土的压实实验中，wp表示( )。",[399,401,403,405],{"key":20,"text":400,"correct":22},"土料相对密实度",{"key":24,"text":402,"correct":22},"土料干密度",{"key":27,"text":404,"correct":29},"土料塑限",{"key":31,"text":406,"correct":22},"土料天然含水量",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},1128108,"对非黏性土料的试验，只需作铺土厚度、压实遍数和（）的关系曲线，据此便可得到与不同铺土厚度对应的压实遍数，根据试验结果选择现场施工的压实参数。",[411,412,414,416],{"key":20,"text":333,"correct":22},{"key":24,"text":413,"correct":22},"最佳含水量",{"key":27,"text":415,"correct":29},"干密度",{"key":31,"text":417,"correct":22},"最大干密度",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1128109,"黏性土的压实标准由( )指标控制。",[422,424,426,427],{"key":20,"text":423,"correct":22},"相对密实度",{"key":24,"text":425,"correct":22},"天然密度",{"key":27,"text":415,"correct":29},{"key":31,"text":333,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},1128110,"推土机的安装方式中( )使用相对广泛。",[432,434,436,438],{"key":20,"text":433,"correct":22},"万能式",{"key":24,"text":435,"correct":22},"移动式",{"key":27,"text":437,"correct":29},"固定式",{"key":31,"text":439,"correct":22},"行走式",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1128111,"以拖拉机为原动机械，另加切土刀片的推土器组成的机械为( )。",[444,446,448,450],{"key":20,"text":445,"correct":29},"推土机",{"key":24,"text":447,"correct":22},"铲运机",{"key":27,"text":449,"correct":22},"装载机",{"key":31,"text":451,"correct":22},"挖掘机械",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1128112,"下列关于土石坝的处理的做法正确的是（）。",[456,458,460,462],{"key":20,"text":457,"correct":29},"坝顶上游侧设混凝土的设防浪墙",{"key":24,"text":459,"correct":22},"坝底上游侧设混凝土的设防浪墙",{"key":27,"text":461,"correct":22},"坝顶下游侧设混凝土的设防浪墙",{"key":31,"text":463,"correct":22},"坝底下游侧设混凝土的设防浪墙",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},1128113,"下列属于钢筋连接方法的是( )。",[468,470,472,474],{"key":20,"text":469,"correct":22},"过楹",{"key":24,"text":471,"correct":22},"榫接",{"key":27,"text":473,"correct":22},"铆接",{"key":31,"text":475,"correct":29},"机械连接",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},1128114,"关于钢筋的剪切，说法错误的是( )。",[480,482,484,486],{"key":20,"text":481,"correct":22},"钢筋切断应 根据配料表中编号、直径、长度和数量，长短搭配",{"key":24,"text":483,"correct":22},"同直径、同钢号且不同长度的各种钢筋编号( 设计编号)应先按顺序编制配料表",{"key":27,"text":485,"correct":29},"应根据调直前的钢筋长度和混凝土结构对钢筋接头的要求，统一配料",{"key":31,"text":487,"correct":22},"下料长度应根据结构尺寸、混凝土保护层厚度、钢筋弯曲调整值和弯钩增加长度 等要求确定",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},1128115,"用冷拉法调直钢筋，其说法错误的是（ ）",[492,494,496,498],{"key":20,"text":493,"correct":22},"钢筋应平直，无局部弯折",{"key":24,"text":495,"correct":22},"成盘的钢筋或弯曲的钢筋应调直后，才允许使用",{"key":27,"text":497,"correct":29},"钢筋调直后如发现钢筋有劈裂现象，应及时修补",{"key":31,"text":499,"correct":22},"钢筋的调直宜采用机械调直和冷拉方法调直，严禁采用氧气、乙炔焰烘烤取直",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1128116,"当构件设计是按最小配筋率配筋时，可按钢筋的( )相等的原则代换。",[504,506,508,510],{"key":20,"text":505,"correct":22},"强度",{"key":24,"text":507,"correct":22},"刚度",{"key":27,"text":509,"correct":22},"受力",{"key":31,"text":511,"correct":29},"面积",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1128117,"用同牌号钢筋代换时，其直径变化范围不宜超过( )mm",[516,517,519,521],{"key":20,"text":133,"correct":29},{"key":24,"text":518,"correct":22},"10",{"key":27,"text":520,"correct":22},"20",{"key":31,"text":129,"correct":22},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1128118,"设计图中钢筋标注和画法，说法错误是( )。",[526,528,530,532],{"key":20,"text":527,"correct":22},"箍筋尺寸为内皮尺寸",{"key":24,"text":529,"correct":22},"弯起钢筋的弯起高度为外皮尺寸",{"key":27,"text":531,"correct":29},"钢筋图中钢筋用细实线表示",{"key":31,"text":533,"correct":22},"单根钢筋的弯起高度为外皮尺寸",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1128119,"非承重侧面模板，混凝土强度应达到( )以上，其表面和棱角不因拆模而损坏时方可拆除。",[538,540,542,544],{"key":20,"text":539,"correct":22},"25×10^2Pa",{"key":24,"text":541,"correct":22},"25×10^3Pa",{"key":27,"text":543,"correct":22},"25×10^4Pa",{"key":31,"text":545,"correct":29},"25×10^5Pa",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},1128120,"跨度在2～8m的其他梁、板、拱的模板拆除，混凝土强度应达到设计强度等级的( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"50%",{"key":24,"text":553,"correct":22},"60%",{"key":27,"text":555,"correct":29},"75%",{"key":31,"text":557,"correct":22},"100%",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1128121,"对于大体积混凝土浇筑块，成型后的偏差不应超过木模安装允许偏差的( )，取值大小视结构物的重要性而定。",[562,564,565,566],{"key":20,"text":563,"correct":22},"0%",{"key":24,"text":551,"correct":22},{"key":27,"text":557,"correct":22},{"key":31,"text":567,"correct":29},"50%—100%",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},1128122,"某跨度为3m的悬臂梁的模板拆除，混凝土强度应达到设计强度等级的( )。",[572,573,574,576],{"key":20,"text":551,"correct":22},{"key":24,"text":553,"correct":22},{"key":27,"text":575,"correct":22},"70%",{"key":31,"text":557,"correct":29},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},1128123,"模板拉杆的最小安全系数应为（）。",[581,582,583,584],{"key":20,"text":344,"correct":22},{"key":24,"text":346,"correct":22},{"key":27,"text":277,"correct":29},{"key":31,"text":585,"correct":22},"2.5",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]