[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128833":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128833,793,2,"多选题","土方填筑的坝面作业中，应对( )等进行检查，并提出质量控制措施。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","土块大小",true,{"key":16,"text":17,"correct":14},"B","含水量",{"key":19,"text":20,"correct":14},"C","压实后的干密度",{"key":22,"text":23,"correct":14},"D","铺土厚度",{"key":25,"text":26,"correct":27},"E","孔隙率",false,"ABCD","2021\u002F2020版教材P89页 坝面的质量检查和控制：在坝面作业中，应对铺土厚度、土块大小、含水量、压实后的干密度等进行检查。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]