[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128805":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128805,793,2,"多选题","地下工程主要采用( )等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","钻孔爆破方法",true,{"key":16,"text":17,"correct":14},"B","掘进机开挖法",{"key":19,"text":20,"correct":14},"C","盾构法",{"key":22,"text":23,"correct":14},"D","顶管法",{"key":25,"text":26,"correct":27},"E","人工开挖法",false,"ABCD","2021\u002F2020版教材P78页 地下工程主要采用钻孔爆破方法进行开挖，使用机械幵挖则有掘进机开挖法、盾构法和顶管法（顶进法）。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]