[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128685":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128685,793,2,"多选题","水库在正常运用情况下，为满足设计的兴利要求在供水期开始时应蓄到的最高水位称( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","校核洪水位",false,{"key":16,"text":17,"correct":18},"B","设计蓄水位",true,{"key":20,"text":21,"correct":14},"C","防洪限制水位",{"key":23,"text":24,"correct":18},"D","兴利水位",{"key":26,"text":27,"correct":18},"E","正常高水位","BDE","2021\u002F2020版教材P23页 (4)正常蓄水位（正常高水位、设计蓄水位、兴利水位）。水库在正常运用的情况下，为满足设计的兴利要求在供水期开始时应蓄到的最高水位。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]