[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128679":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128679,793,2,"多选题","为了减小坝体的渗透压力，主要措施有（）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","靠近上游坝面设置排水管幕",true,{"key":16,"text":17,"correct":14},"B","排水管幕与上游坝面的距离一般为作用水头的1\u002F15~1\u002F25",{"key":19,"text":20,"correct":14},"C","排水管幕与上游坝面的距离一般为作用水头不小于2.0m。",{"key":22,"text":23,"correct":14},"D","排水管间距2～3m",{"key":25,"text":26,"correct":27},"E","排水管间距4～5m",false,"ABCD","2021\u002F2020版教材P6页 为了减小坝体的渗透压力，靠近上游坝面设置排水管幕，排水管幕与上游坝面的距离一般为作用水头的1\u002F25~1\u002F15,且不小于2m。排水管间距2~3m。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]