[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128642":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128642,793,2,"多选题","根据施工方法、施工条件及土石料性质的不同，坝面作业可分为（ ）几个主要工序。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","覆盖层清除",false,{"key":16,"text":17,"correct":18},"B","铺料",true,{"key":20,"text":21,"correct":18},"C","整平",{"key":23,"text":24,"correct":14},"D","质检",{"key":26,"text":27,"correct":18},"E","压实","BCE","本题考查的是土石坝、堤防填筑施工。根据施工方法、施工条件及土石料性质的不同，坝面作业可分为铺料、整平和压实几个主要工序。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]