[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1128602":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1128602,793,2,"多选题","（2019年）开发建设项目水土流失防治指标包括（）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土地侵蚀模数",false,{"key":16,"text":17,"correct":18},"B","扰动土地整治率",true,{"key":20,"text":21,"correct":18},"C","水土流失总治理度",{"key":23,"text":24,"correct":18},"D","土壤流失控制比",{"key":26,"text":27,"correct":18},"E","拦渣率","BCDE","开发建设项目水土流失防治指标应包括扰动土地整治率、水土流失总治理度、土壤流失控制比、拦渣率、林草植被恢复率、林草覆盖率等六项。",{"id":6,"name":31,"category":32,"favorite":33},"二建水利水电实务","建筑工程",0]